AGATA Slow Control Legnaro, 2009 02 19 - Legnaro EDAQ meeting -
Last meeting June 10th 2008 in Padova • Not so much progress : interfaces between two WG, responsibilities and manpower. • Need more coordination between DAQ and FEE • Already some discussion this week, to be continued on a regular basis • DAQ WG task 3 : « slow control integration » (apologize from F. Saillant). • Need for a new team ? - Legnaro EDAQ meeting -
Two slow control level : • Low level (on virtex, vhdl) • High level, any language • Need connection with top level (RC) • Init/Start/Stop/Save/Restore … • state machine • web services : see Vic’s implementation • GUI, not necessarily sophisticated • Saving/restoring parameters : see Vic’s implementation • Log : see Vic’s SC • Monitoring : some tools available like spectra using GRU, rates using WS, … - Legnaro EDAQ meeting -
Configurations management : how ? • Experiment topology : link between IP address / hardware / detector • Interdependences • Slow control harmonization • … • … - Legnaro EDAQ meeting -
Agenda • Introduction (Christophe and/or Dino) • Short presentation of network and infrastructure (E. Calore) • Short presentation of web services (Pietro/Michele) • Digitizer slow control status (Vic) • ENX and the slow control for Orsay mezzanines (Nicolas) • Mezzanines GUI (Nabil) • GTS slow control (Joel) • The carrier slow control (Damiano) • Discussion on the carrier, GTS and Trigger slow control (All) - Legnaro EDAQ meeting -
ToDo - Priorities • Vic’s WSDL implementation • Definition of new WSDL messages • Synchronization of subsystems – sequences of actions. Document list of actions. Coordination of SC technologies • Topology • Save/Restore • Global configuration (RC) In parallel : • Monitoring • Diagnostic : replace chipscope • GUIs - Legnaro EDAQ meeting -
Responsibilities • Need someone to coordinate - Legnaro EDAQ meeting -
Meetings • Agata week. Tuesday afternoon ? • F2f meeting in june ? - Legnaro EDAQ meeting -