1 / 15

Bobwhite-Manatee Transmission Line Project

Bobwhite-Manatee Transmission Line Project. Longleaf Environmental Consulting Steven Goodman, Project Manager (UWF GIS4043/L) April 28, 2014. Arbor Day Foundation . Bobwhite-Manatee Transmission Line Project. Background Phase. Arbor Day Foundation . Project Goals and Objectives.

lynnea
Download Presentation

Bobwhite-Manatee Transmission Line Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bobwhite-Manatee Transmission Line Project Longleaf Environmental Consulting Steven Goodman, Project Manager (UWF GIS4043/L) April 28, 2014 Arbor Day Foundation

  2. Bobwhite-Manatee Transmission Line Project Background Phase Arbor Day Foundation

  3. Project Goals and Objectives • Goal: Select optimal transmission line route based on four primary factors: • Proximity to schools and daycares • Environmental impact • Proximity to individual homes and land parcels • Length and cost of line

  4. Study Area and Data • Role of GIS • Manatee and Sarasota Co. • Basemap layers • Data needs • Data acquisition and source • Data limitations

  5. Cartographic Model • Defines goals and objectives • Broken down by criteria • Lists data requirements • Lists GIS approaches and tools • Illustrates feedback loops, including public comment

  6. Bobwhite-Manatee Transmission Line Project Analysis and Results Phase Arbor Day Foundation

  7. Environmental Analysis • Minimize impact • Study area location • Impacted conservation lands • Impacted uplands • Impacted wetlands • GIS process and tools • Other potential analysis

  8. Environmental Analysis

  9. Schools and Daycare • Research on adverse effects on children • Avoid locating line within 400ft • GIS process and tools • No schools or daycares within 400ft of line

  10. Impacted Homes • Minimize impact • Balancing act • 20 houses within corridor • 26 houses within 400 Ft. buffer • Most homes along current lines and right-of-ways

  11. Impacted Parcels • Minimize number impacted • Future value • Current land uses • GIS processes and tools • 162 within corridor • 93 within buffer

  12. Estimated Line Length • Use of existing Roads • Manatee River/Lake • Engineering/cost related to line length • Estimated length = 24.5 • Cost per mile

  13. Conclusion • Were overall goals and objectives met? • Balancing the four criteria • Community participation and buy-in • Conservation opportunities • Additional capabilities • Role of GIS and ArcMap software Arbor Day Foundation

  14. Works Cited Feychting. M and A. Ahlbom. 1993. Magnetic Fields and Cancer in Children Residing Near Swedish High-voltage Power Lines. American Journal of Epidemiology 138(7): 467-481. Florida Power and Light Company. 2014. FAQs: Planning for a Brighter Future; the Role Power Lines Play. http://www.fpl.com/environment/lines/brighter_future.shtml Florida Power and Light Company. 2014. FPL’s Bobwhite-Manatee Power Line. http://www.fpl.com/environment/lines/bobwhite.shtml Klein, Mel. 2006. “November 3, 2006 letter.” Florida Power and light Company.

  15. Bobwhite-Manatee Transmission Line Project Questions? Arbor Day Foundation

More Related