Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir Project ( Rogun HPP) . Information Sharing and Riparian Discussions Almaty , Kazakhstan May 17-19, 2011. The Techno-Economic Assessment Study (TEAS).
E N D
Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir Project (Rogun HPP) Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, 2011
The Techno-Economic Assessment Study (TEAS) Purpose: The TEAS study will fully assess the engineering, geological, hydrologic, and economic aspects of the proposed project consistent with current international standards. Including: • Assessment of a salt intrusion in the foundation area of the proposed dam • Appraisal of existing works • Viability of an intermediate height dam as a stand-alone project • Analysis of dam options, including the originally proposed 335 high dam, and identification of preferred design option • Detailed assessment of preferred design option
The Environmental and Social Impact Assessment (ESIA) Purpose: The ESIA will identify, assess and prepare management plans for potential environmental and social impacts, and resettlement plans. The study will cover potential impacts in Tajikistan and riparian countries. Including: • Screening of environmental and social impacts • Impact assessment of an intermediate height dam as a stand along project • Environmental Impact Assessment and Environmental Management Plan for the preferred option • Resettlement Framework and Resettlement Plan for the primarily affected areas