1 / 12

INVESTMENT PROJECT #14 PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS

INVESTMENT PROJECT #14 PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS. Preliminary cost of the project – 2,5 mln . USD (equipment, installation and others); Project initiator – “ Potok Azia ” LLC; Possible annual production capacity – 100 pcs per year;

lynsey
Download Presentation

INVESTMENT PROJECT #14 PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INVESTMENT PROJECT #14PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS Preliminary cost of the project – 2,5 mln. USD (equipment, installation and others); Project initiator – “PotokAzia” LLC; Possible annual production capacity – 100 pcs per year; Annual domestic demand – 50-150 pcs per year; Current manufacturers – “Union Energy Systems“ GC,“TSS“GC, “Energy Holding“ LLC, CJSC “MPZ”, “VETZ-energy-systems”; Existent annual capacity – 50 pcs per year; Available raw materials – Gasoline, Diesel Fuel, metal; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume – up to 30 % of total production capacity to СIS and other countries; Number of new work places – 16 persons; Equipment supplying countries – China, Korea and Japan. 33

  2. INVESTMENT PROJECT #15PRODUCTION OF TEXTILE PRODUCTS Preliminary cost of the project – 35 mln USD(equipment, construction, installation and others); Project initiator – “Jizzaksuntex” LLC Possible annual production capacity – 8 500 tons per year; Annual domestic demand – 8 000 tons per year; Current manufacturers –“Plastex”, “Fergana DEU textile”, “HorezmAlisher Textile”, “Kabul textile” (not functioning); Existent annual capacity – 8 000 tons per year Available raw materials – cotton; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Export volume- 70% per year to СIS countries and etc; Number of new work places – 600; Equipment supplying countries – Germany. 35

  3. INVESTMENT PROJECT #16PRODUCTION OF BRICKS Preliminary cost of the project – 1.2 mlrd. sum(equipment, construction, installation and others); Project initiator – «TovoqsoyQurilishMollari» PE; Possible annual production capacity – 10 000 000 pcs per year; Current manufacturers – “Zebo Business”, “GazalkentQurilishMollari”, “BostonliqGishtzavodi”; Existent annual capacity – 7 000 000 pcs per year; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume- 50 % of the total value to Kirgizia and Kazakhstan; Number of new work places – 12; Equipment supplying countries – Russia, China. 36

  4. INVESTMENT PROJECT #17PRODUCTION OF SPINNING Preliminary cost of the project – 2.5 mln USD(equipment, construction, installation and others); Project initiator – “Rushantex”LLC; Possible annual production capacity – 900 000 meters per year; Current manufacturers – JV “Textiles Spectrum Colors”, “NakshOydin”LLC; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 700 000 meters per year; Available raw materials – cotton; Export volume- 20-30% per year to СIS countries and etc; Number of new work places – 18; Equipment supplying countries – Germany, Switzerland. 37

  5. INVESTMENT PROJECT #18PRODUCTION OF GLASSWARE Preliminary cost of the project – 6 mln USD(equipment, installation and others); Project initiator – «Horazm shisha idishlari »; Possible annual production capacity – 200 mln items per year; Annual domestic demand 650 mln items per year; Current manufacturers – “Kvarz” Ltd, “Asyl Oina”, “Glasstid”; Existent annual capacity - 300 mln items per year; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Available raw materials – salpeter, potassium soda, chalk-stone, sodium sulfate, quartz sand Export volume - 14 mln items per year to СIS countries and Afghanistan; Number of new work places – 25-30; Equipment supplying countries – China. 38

  6. INVESTMENT PROJECT #19PRODUCTION OF MOHAIR PRODUCTS Preliminary cost of the project – 300 mln USD(equipment, installation and others); Project initiator – ООО “OnorzorUmbir Ahmad”; Possible annual production capacity – 750 000 square meters of mohair towels, 200 000 pcs of mohair blankets and 200 000 pcs of mohair robes per year; Current manufacturers – “Namangan momiq”, “BF Textile”; Existent annual capacity – 650 000 square meters of mohair towels, 100 000 pcs of mohair blanket and 100 000 pcs of mophair robes per year; Available raw materials – Yarn; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume- 62% items per year to СIS countries; Number of new work places – 40; Equipment supplying countries – China. 39

  7. INVESTMENT PROJECT #20PRODUCTION OF CONSTRUCTION MATERIALS Preliminary cost of the project – 100 000 – 200 000 USD(equipment, installation and others); Project initiator – “Namuna” Ltd; Possible annual production capacity – 5872 items per year; Current manufacturers – AS “Kvarz”, “Andpolic” JV; Available raw materials – cement; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume- 2 000 items per year to СIS countries; Number of new work places – 25; Equipment supplying countries – China. 40

  8. INVESTMENT PROJECT #21PRODUCTION CARBON DIOXIDE AND LIME Preliminary cost of the project – 1,5 mln USD(equipment, installation and others); Project initiator – “DioksidBiznes”LLC; Possible annual production capacity – 1 500 tons carbon dioxide and 540 tons lime per year; Current manufacturers – “Chirchik-Maksan”JV, “Bektimirspirt”LLC; Existent annual capacity – 750 tons of carbon dioxide per year; Required infrastructure - water, electricity, gas, canalization, automobile road; Export volume- 25-30% of total volume per year to СIS countries; Number of new work places – 40-50; Equipment supplying countries – Uzbekistan. 41

  9. INVESTMENT PROJECT #22PRODUCTION OF FRESH AND CANNED MUSHROOMS Preliminary cost of the project – 350 thousand USD(equipment, installation and others); Project initiator – “For CreotDevelopment”SD; Possible annual production capacity – 300 tons of fresh mushrooms and 250 tons of canned mushrooms per year; Annual domestic demand – (after domestic producers products)items per year; Available raw materials – cotton shell, glass containers, twist cap; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 240 tons of fresh mushrooms and 200 tons of canned mushrooms per year; Export volume- 50% of canned mushrooms per year to СIS countries; Number of new work places – 20; Equipment supplying countries – Uzbekistan. 42

  10. INVESTMENT PROJECT #23PRODUCTION OF HOUSEHOLD Preliminary cost of the project – 800 thousand USD(equipment, installation and others); Project initiator – “Adana Production Group”LLC; Possible annual production capacity – 10 000 tons of laundry detergent for hand washing, 15 000 tons of laundry detergent for machine washing and 5 000 tons of universal detergents per year; Annual domestic demand – 20% (after domestic producers products)items per year; Available raw materials – sodium sulfate, sodium metasilicate, soda ash and etc; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 6 000 tons of laundry detergent for hand washing , 10 000 tons of laundry detergent for machine washing and 2 000 tons of universal detergents per year ; Export volume- 30% per year to СIS countries; Number of new work places – 100; Equipment supplying countries – China, Turkey. 42

  11. INVESTMENT PROJECT #24PRODUCTION OF PIGMENTS AND DYES FOR THE TEXTILE INDUSTRY Preliminary cost of the project – 800 thousand USD(equipment, installation and others); Project initiator – “DelvitaTrade”LLC; Possible annual production capacity – 1 000 tons of pigments and dyes for the textile industry per year; Annual domestic demand – 500 tons (after domestic producers products) per year; Current manufacturers – “Pigment”, “Bersa group”, “Basf group”; Available raw materials –technical ammonia, glycerin, sulfuric acid, acetic acid, water ; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 500 tons of pigments and dyes for the textile industry per year; Export volume- 50% tons per year to СIS countries; Number of new work places – 30; Equipment supplying countries – India, Germany. 42

  12. INVESTMENT PROJECT #25PRODUCTION, STORAGE OF FRUITS AND VEGETABLES Preliminary cost of the project – 498 thousand Euro(equipment, installation and others); Project initiator – “Nagohon Auto Texservis”PE; Possible annual production capacity – 1 000 tons of apples, 500 tons of grapes, 500 tons of pears, 500 tons grenades, 150 tons of plums per year; Annual domestic demand – 500 tons of apples, 250 tons of grapes, 100 tons of pears, 100 tons grenades, 50 tons of plums (after domestic producers products) per year; Available raw materials – apples, grapes, pears, grenade and plums; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 500 tons of apples, 250 tons of grapes, 100 tons of pears, 100 tons grenades, 50 tons of plums ; Export volume- 70% tons per year to СIS countries; Number of new work places – 30; Equipment supplying countries – Holland, Belgium. 42

More Related