Micro Finance Management System (MFMS) For INTEGRATECH
Agenda • The Team • Project Background • Scope • Effort Estimate –contrast with FPC/Coster • Risks • Quality plan • Technical Strategy (high level technical approach)
The Team M-Tech in Software Engineering Team2E • Anupama • Bright D L • JawaharChelliah • Karthi K • Maya Roosevelt • Satish Kumar • Tan Achilles
Project Background • Microfinance is the provision of financial services to low-income people or the self-employed, who lack access to banking and related services. • Microfinance Institutions (MFIs) brings the banking to the cooperative societies. In MFI context, each society is a small group of people, led by a team leader. Team leader acts as a point of contact between MFI branch and group. MFI branch allocates a loan officer for product like loan/Saving processing with each group and a loan collector for loan collection within vicinity.
Project Background - continued • Currently, there are software systems available to meet MFI requirements but mobility of the business and level of cooperation between branch and its members requires better software solution with proper integration with mobile workflow. • On behalf of Integratech, Team 2E ISS, MTech will propose a software solution and develop this system – Microfinance Management System (MFMS) based on the collected requirement as per User Requirement Specification.
Scope • The high level scope of the project is to provide a total solution to the MFMS project by developing a system to integrate the back office (MIFOS) application with the mobile handheld device (IPT300) and thus enabling data exchange through a Middleware application
Effort Estimate - FPC • The total combined effort from Staff Effort Estimates table is calculated as 515 man-days. • 1 man day represents 5 man hours • Thus, estimated man-days for each team member will be about 74 man-days (515 / 7). • (Details as per Project Plan)
Effort Estimate - Coster • (Details as per Project Plan)
Risks The following are identified as potential risks and are addressed as part of this project (Project plan Appendix D) • Possibility of Change request • Installation/Customisation of MIFOS Application • Integration with Mobile Channel • Team skill set • Development on the Hardware IPT300 • Sponsor support • UI Design
Quality Plan The Quality Plan talks about : • Project Organisation • Liaison with Client, Point of Contacts • Documentation Organisation • Work plan and Deliverables • Planning and Progress Control • Quality Controls • Standard, Method and Tools • User and Change Management • Defect Management