An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lockout/Tagout Authorized Employees: Learn the Procedures

  2. Section I Introduction

  3. Introduction • Lockout/tagout • Employees • Energy sources

  4. Introduction • Amount of energy • Procedures • Tagout

  5. Introduction • Testing, positioning • Shift changes • Group lockout

  6. Section II What is lockout/tagout?

  7. Lockout/tagout (LOTO) Prevents injury: • Servicing • Maintenance

  8. Lockout/tagout (LOTO) • Locks • Tags • Stop energy flow

  9. LOTO devices • Locks • Blanks • Blinds • Covers

  10. LOTO devices • Lockout/tagout only • Durable • Standardized • Identify employee

  11. Service/maintenance • Construct • Install • Set up • Adjust • Inspect

  12. Service/maintenance • Modify • Lubricate • Clean • Clear jams • Tool changes

  13. LOTO during normal production • Remove/bypass guard • Body in point of operation

  14. LOTO standard 29 CFR 1910.147

  15. Section III Employee designations

  16. Employee designations Authorized: • applies locks and tags • does service, maintenance work

  17. Employee designations Affected: • machine operator • works where LOTO is used

  18. Employee designations Other: • may work were LOTO may be used

  19. Authorized employee • Recognize energy sources • Types, magnitude of energy • LOTO procedures

  20. Section IV Energy sources

  21. Energy sources • Electrical • Mechanical • Hydraulic • Pneumatic • Steam

  22. Energy sources • Fluids under pressure • Chemical • Gases • Gravity • Thermal

  23. Section V Energy type, magnitude

  24. Energy type, magnitude • Multiple energy supplies • Amount of energy • Stored energy

  25. Section VI Lockout/tagout procedures

  26. Apply LOTO 1. Prepare for shutdown • review energy information • review energy control procedures • notify affected employees

  27. Apply LOTO 2. Shutdown • normal operating procedures

  28. Apply LOTO 3. Isolate equipment • operate energy isolating devices • multiple energy supplies

  29. Apply LOTO 4. Apply LOTO devices • lock (tag) on each energy isolating device

  30. Apply LOTO 5. Release stored energy • release • relieve • disconnect • restrain

  31. Apply LOTO 6. Verification • operate machine controls • return to “off” position • check gauges • use test equipment

  32. Remove LOTO 1. Check the machine • replace guards • remove blocks • remove tools

  33. Remove LOTO 2. Check for employees • clear of machine • all in safe area

  34. Remove LOTO 3. Remove LOTO devices • removed by person who applied them

  35. Remove LOTO 4. Notify employees • after LOTO devices removed • before starting machine

  36. LOTO procedures • Equipment I.D. • Enforcement • Affected employees • Energy information

  37. LOTO procedures • Normal operating controls • Energy isolating devices • Stored energy • Verification • LOTO removal

  38. Section VII Tagout system

  39. Tagout system • Warning device • Less control than a lock • Do not bypass, ignore tag • Removed by person who applied it

  40. Tagout system • Legible • Understandable • Durable • False sense of security

  41. Tagout system • If it can be locked out, it must be locked out

  42. Section VIII Testing, positioning

  43. Testing, positioning • Check machine • Clear employees • Remove locks • Energize and test • Deenergize and lock • Continue servicing

  44. Section IX Transfer

  45. Transfer Person who applies lock must remove it

  46. Transfer Person working on equipment must apply own lock

  47. Transfer • Multi-lock hasp • On-coming worker applies lock • Off-going worker removes lock

  48. Section X Group lockout/tagout

  49. Group LOTO • Each worker applies own lock • Multi-lock hasp • Group lockbox

  50. Group LOTO • Primary authority • “Job lock” keys locked in group lockbox