1. Florida Department of Environmental Protection Air Resource Management
Southwest District Office
2. 2 Introductions
3. 3 Outline
4. 4 Nonmetallic Mineral Processing (NMMP) Plant General Permit (GP) Requirements
5. 5 NMMP Rule: 62-210.310(5)(e) F.A.C.Air General Permit for Facilities Comprising Nonmetallic Mineral Processing Plants
6. 6 Fuel Consumption Limits
7. 7 Controlling Unconfined Particulate Matter
8. 8 EPA Regulatory and Inspection Manual for Nonmetallic Minerals Processing Plants (305-B-97-008)
9. 9 Controlling Yard Dust
10. 10 General Visible Emissions Requirement
11. 11 Subpart OOO Requirements
12. 12 Subpart OOO Requirements
13. 13 Subpart OOO Requirements
14. 14 Subpart OOO Requirements
15. 15 Subpart OOO Requirements
16. 16 Subpart OOO Requirements
17. 17 Subpart OOO Requirements
18. 18 Subpart OOO Requirements
19. 19 EPA Regulatory and Inspection Manual for Nonmetallic Minerals Processing Plants (305-B-97-008)
20. 20 Subpart OOO Requirements
21. 21
22. 22 EPA Regulatory and Inspection Manual for Nonmetallic Minerals Processing Plants (305-B-97-008)
23. 23 Subpart OOO Requirements
24. 24 Subpart OOO Requirements
25. 25 Subpart OOO Requirements
26. 26 Subpart OOO Requirements
27. 27 Initial Performance Tests Rule 62-210.310(5)(e)3.e., F.A.C.
28. 28 Annual Performance Tests Rule 62-210.310(5)(e)3.e., F.A.C.
29. 29 Annual Performance Tests
30. 30 Annual Performance Tests
31. 31 Annual Performance Tests
32. 32 Annual Performance Tests
33. 33 Relocation Requirements
34. 34 Conditions for Collocation
35. 35 Conditions for Collocation
36. 36 Conditions for Collocation
37. 37 Non-routine Operation at Non-Title V Facilities
38. 38 New Requirements in 40 CFR 60, NSPS Subpart OOO for NMMPs
39. 39 New Requirements in 40 CFR 60, NSPS Subpart OOO for NMMPs
40. 40 New Requirements in 40 CFR 60, NSPS Subpart OOO
41. 41 Potentially Affected Regulated Entities
42. 42 Monitoring Requirement Addition
43. 43 Initial Testing Requirement for Fugitive Emissions Revision
44. 44 Initial Testing Requirement for Fugitive Emissions Addition
45. 45
46. 46 Initial Testing Notification Requirement Revision
47. 47 Initial Testing Notification Requirement Addition
48. 48 Recordkeeping and Report Requirement Addition
49. 49 Recordkeeping and Report Requirement Revision
50. 50 Recordkeeping and Report Requirement Addition
51. 51 RAP Crusher at Asphalt Plants
52. 52 Waste Processing Facility Permit Requirements
53. 53 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
54. 54 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
55. 55 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
56. 56 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
57. 57 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
58. 58 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
59. 59 Solid Waste Management RuleChapter 62-701, Florida Administrative Code (F.A.C.)
60. 60 Any Questions, Comments? DEP Air Contact: Natrevia GradneyNatrevia.Gradney@dep.state.fl.us DEP’s websitewww.dep.state.fl.us/airEPA’s Federal Register Websitewww.epa.gov/federalregister EPA Regulatory and Inspection Manual for Nonmetallic Minerals Processing Plants: Document No. 305B97008http://nepis.epa.gov/epa/html/pubs/pubtitleother.htm