1 / 25

Graduation Project Thesis: Redesign of Faisal Street-Nablus

Graduation Project Thesis: Redesign of Faisal Street-Nablus Dima Aquil Qamhiyeh Dina Marwan Abdulhaq May 2009. Introduction. Why Faisal street ? Study area, problems, and methodology. Alternatives ( Arterial Management System, a Tunnel (underpass). Why Faisal street ?.

maddox
Download Presentation

Graduation Project Thesis: Redesign of Faisal Street-Nablus

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Graduation Project Thesis: Redesign of Faisal Street-Nablus Dima Aquil Qamhiyeh Dina Marwan Abdulhaq May 2009

  2. Introduction Why Faisal street ? Study area, problems, and methodology. Alternatives ( Arterial Management System, a Tunnel (underpass) .

  3. Why Faisal street ? Arterial street: that connects the western part of the city with the eastern one Central part (CBD) Institutions: Municipality/ Police center / Post office / Al-Watany hospital

  4. Study Area The study area starts from Al-Salam mosque in Haifa street to Al-Ballor Hall in Faisal street

  5. Problems Traffic problems: Congestion Problems Delay Problems Safety Problems Geometry Problems

  6. The methodology Data collection. Data analysis References as AASHTO 2001, and the European Standard.

  7. Through Traffic: License plate counts. Peak periods ( 7:00-9:00 am ) and (1:00-300 pm). Peak hour (1:00-2:00). Maximum Peak hour volume (PHV) = 360 vehicle/hr.

  8. Arterial Development and Management SystemAlternative Re-planning of the arterial. Widening and reallocation of space as needed. Separating through traffic from local traffic .

  9. Arterial Development and Management SystemAlternative Study Area From Al-Salam Mosque to Al-Ballor Hall We divided the study area into three parts:

  10. Part One

  11. Part Two

  12. Part Three

  13. Due to streets’ widths and existing of commercial and residential buildings in the first and third part of the study area we applied the system on second part only. Arterial Development and Management SystemAlternative

  14. Arterial Development and Management System Alternative’s cross section

  15. Design criteria For a design speed of 45 mph and urban arterial highway : Super elevation (e)=6% Friction factor (f) =0.145

  16. The center line of the Arterial System

  17. The plan of the Arterial System

  18. Underpass (Tunnel) Alternative Building a tunnel was the second alternative to solve the streets’ problems. The Tunnel was for through traffic only This will separates the through traffic completely from the local traffic and doesn’t affect the traffic on the original street over the tunnel.

  19. Underpass (Tunnel) Alternative Study Area From Al-Salam Mosque to Al- Ballor Hall

  20. Tunnel’s cross section

  21. Center line of the Tunnel Alternative

  22. The plan of the Tunnel Alternative

  23. The plan of the local traffic

  24. The profile of the Tunnel Alternative

  25. End of Presentation Ready to learn from your comments and questions.

More Related