60 likes | 270 Views
Lesson Summary. 19.11.07. M. S. Martin 21/11/07. Flooring – click your mouse to bring up each point. Two main types of construction Platform flooring & Cut in Floors (typically strip flooring is used)
E N D
Lesson Summary 19.11.07 M. S. Martin 21/11/07
Flooring – click your mouse to bring up each point • Two main types of construction • Platform flooring & • Cut in Floors (typically strip flooring is used) • Click mouse again to look at the sketches opposite & review your notes from P20 Cut in floors Platform Floors
Face fixed or secret nailed Laying & Clamping – click mouse to bring in each point Select the longest run of flooring String a line through middle of building parallel to outside walls Lay a run of boards along this line Note: in small rooms you might start from one wall and work towards the other Cut and lay say 4 runs of board on each side of centre Cramp & fix Continue laying & cramping boards in sections of 6 to 8 board maximum When you get close to the wall you will need to use an alternative to floor clamps, timber or a chisel Strip Flooring Undercut but joints or Or use end matched boards
Platform floors • Types • Structural Grade particle board • Plywood • Compressed cement sheet • Sheet sizes vary in thickness which effects joist span 450 or 600 centres
Review your workbook calc’s Calculations Look at the sketch below: When working out quantities of floor boards to suit a particular room in a house, we calculate the amount of boards using effective cover per square metre of floor area, see the simple description below. 1.0 x 1.0 = 1.0m² = 1.0m = 1000mm For the purpose of the example, let’s say our floor boards have an effective cover of 86mm, therefore: 1000 or 1.000 = 11.627 86 .086 Which means you can lay 11.627 lineal metres of floor boards per / m² of floor area 1.0m 1.0m
Practical Assessment • Bearer & Joist exercise in basement • Demonstration of flooring clamps & strip flooring • Explanation of different set out for sheet flooring & strip.