WFC3 FSW and STScI Development Flow through SMGT. 3/1/02-5/31/02. 6/3/02-7/31/02. 7/8/01-8/15/01. 8/16/01-11/17/01. 12/15/01-4/4/02. 12/3/01 - 2/27/02. 11/1/01-1/17/01. 4/2/01-7/30/01. Boot Code Testing. FSW 3.0 Component Test. FSW 3.0 C&UT. FSW 2.1 C&UT. FSW 2.1 C&UT.
E N D
WFC3 FSW and STScI Development Flow through SMGT 3/1/02-5/31/02 6/3/02-7/31/02 7/8/01-8/15/01 8/16/01-11/17/01 12/15/01-4/4/02 12/3/01 - 2/27/02 11/1/01-1/17/01 4/2/01-7/30/01 Boot Code Testing FSW 3.0 Component Test FSW 3.0 C&UT FSW 2.1 C&UT FSW 2.1 C&UT FSW 2.3 C&UT Final Qualification Test FSW 2.2 C&UT - SES 1 Board (due 10/29/01) - WFC3 TBD Bench - SITS - WFC3 TBD Bench - SITS - COS Bench - SITS - WFC3 Software Bench - SITS - WFC3 TBD Bench - SITS - WFC3 Software Bench - SITS FSW 2.3 Component Test FSW 2.1 Component Test FSW 2.2 Component Test 8/16/01-10/31/01 10/31/01-2/28/02 Ship to GSFC ~8/15/02 4/1/02-6/30/02 9/1/02-12/31/02 2/1/03-4/30/03 11/15/02-4/30/03 SMS Test Phase 2 & 3 SMS Test Phase 4 & IR Subarrays SMS Test Phase 5 Pre-SMGT Bench Testing Continued on the Next Page • WFC3 TBD Bench • - SITS • Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • SITS • - Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • - SITS • - Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • - SITS • - Database (CCL, Cmd, TLM) • - Macros • - FSW 3.0
WFC3 FSW and STScI Development Flow through SMGT - concluded TBD NSSC AP’s TBD VEST Dry Run • - VOCC/CCS • VEST • Bench? TBD No earlier than 5/1/03 TBD VEST I&T SMGT VEST I&T From Pre-SMGT Bench Testing • - WFC3 Instrument • - SMPRD Database • - Macros • - VOCC/CCS • FSW 3.X • VEST • PACOR/STScI • - WFC3 Instrument • - SMPRD Database • - Macros • - STOCC/CCS • FSW 3.X • VEST • PACOR/STScI • - S/W or Ops Bench • - SMPRD Database • - Macros • - VOCC/CCS • FSW 3.X • VEST • PACOR/STScI TBD PRD Office • - Commands • Telemetry • Tables • CCL’s • Display Pages
WFC3 FSW Development Flow (2.1 through 2.2) CCS 3.4.0.3 SITS 1 5.4 (S/W Bench) 7/31/01 WFC3 S/W Bench MEB 8/16/01-10/31/01 7/2/01-8/31/01 FSW 2.1 C&UT Component Test 2.1 FSW 2.1 consists of - Telemetry (5/15/02) - BMM (5/15/02) -Limit Checking (2/8/02) -Mem/Image Dump (2/8/02) - Command (11/14/01) - Memory Load/Copy (2/13/02) - Error Handling (5/3/02) Dates are component test complete from 10/19/01 schedule - S/W Bench - SITS DRD Items 10/1/01 DRD Items SITS 2 5.4.1 (Ops Bench) 10/1/01-11/16/01 10/1/01-12/15/01 WFC3 Ops Bench - DM-06 (Initial) Boot Code C&UT Boot Code Testing Hardware 10/15/01 MEB 2 - SES2 (10/19/01) - SES3 (9/14/01) - SES4 (9/7/01) 10/29/01 SES 1 Board 8/16/01-11/15/01 FSW 2.2 C&UT FSW 2.2 consists of - Sys Init & Service Functions (4/30/02) - Mech & Lamps (Part 1) (2/25/02) Dates are test complete from 10/19/01 schedule Mechanisms (Test Software) 10/31/02- 1/28/02 • - SOFA/Corrector (10/17/01) • - Shutter (10/17/01) • Filter Wheel (10/19/01) • - Mech Sim1 (10/1/01) FSW 2.2 Component Test To FSW 2.3 Code & Unit Test
WFC3 FSW Development Flow (2.3 through System Functional Test) From FSW 2.2 Component Test DRD Items - TBD 12/1/01-3/31/02 11/16/01-1/15/02 Hardware FSW 2.3 Component Test WFC3 System Functional Test (MEB Install) FSW 2.3 C&UT FSW 2.3 consists of - (11/16/01) Normal Engineering Data (NED) - (4/19/01) Diagnostics - Mech & Lamps (Part 2) (4/29/02) CSM & IR FW (2/26/02) Lamps Dates are Unit Test complete on left from 10/19/01 schedule - SES1 (10/29/01) - SES2 (9/14/01) Mechanisms (Test Software) • CSM (11/19/01) • - Mech Sim2 (11/15/01) FSW 3.0 consists of - (5/10/02) IR detector (5/31/02) - (4/19/02) UVIS detector (6/12/02) Dates are Build, Install & Verify on left, “run for record” on right from 10/19/01 schedule WFC3 System Functional Test (Surrogate Detector Install) DRD Items - TBD 11/1/01-3/15/02 3/1/02-9/30/02 6/13/02-8/17/02 8/15/02 Support FSW 3.0 Component Test FSW FQT SI Delivery to GSFC FSW 3.0 C&UT -TBD Bench - UVIS/IR Detector Simulator (9/21/01) - UVIS/IR Science Data Generator(12/1/01) -TBD Bench DRD Items Procedures not fully component tested in 3.0 can be run against the hardware if the procedure is dry run on the bench first. Mechanisms - Need List of Deliverables - TBD
WFC3 STScI Ground System Support Development Flow (Phases 2 – 4) 1/1/01-6/30/01 7/1/01-12/31/01 Phase 2 Phase 3 development FSW 2.2 Macro Timing • - Aperture Definitions • - Basic UVIS ACCUM Mode • UVIS Dark and Bias Calibration - Basic IR MULTIACCUM Mode - IR Dark Calibrations - UVIS & IR Lamp Operations Macro Timing 4/5/02-7/4/02 FSW 2.3 Phase 2 & 3 SMS Test Window Macro Timing FSW 3.0 7/1/02-10/1/02 Initial Phase 5 Development 1/1/02-6/30/02 - IR Subarrays - SMGT Preparations - SMOV Special Commanding DRD Items Phase 4 development • UVIS & IR ALIGN Mode • Timing Updates • SAA Contour Defintions • UVIS CTE Monitoring • IR Bright Earth Avoidance - DM-06 (Initial) Support 9/2/02-11/29/02 Remainder of phase 5 and phases 6 & 7 development (needed post Launch) Phase 4 & Initial Phse 5 SMS Test Window - Detector Simulator - Science Data Generator SMGT No earlier than 5/1/03