KHABAROVSK REFINERY HYDROPROCESSING PROJECT ARU / SWS – MAIN EQUIPMENT. TRAINING COURSE. APRIL 29th – MAY 3rd 2013, MADRID, SPAIN. MAIN EQUIPMENT DESCRIPTION. ARU IS EQUIPPED WITH THE FOLLOWING MAIN EQUIPMENT:. RICH AMINE FLASH DRUM AMINE REGENERATOR AMINE SUMP DRUM
E N D
KHABAROVSK REFINERY HYDROPROCESSING PROJECT ARU / SWS – MAIN EQUIPMENT TRAINING COURSE APRIL 29th – MAY 3rd 2013, MADRID, SPAIN
MAIN EQUIPMENT DESCRIPTION ARU IS EQUIPPED WITH THE FOLLOWING MAIN EQUIPMENT: • RICH AMINE FLASH DRUM • AMINE REGENERATOR • AMINE SUMP DRUM • STORAGE AND DELIVERY SECTION
RICH AMINE FLASH DRUM MAIN FEATURES • Packed column on top of the drum • Internal skimming pot • Rich DEA solution • Blanketed with inert gas
RICH AMINE FLASH DRUM MAIN PARAMETERS: • Pressure controlled • Amount of cold lean amine sent to scrubber (around 1.5 m3/h) • OPERATING CONDITIONS
AMINE REGENERATOR MAIN FEATURES • Valve type trays • Chimney tray • Top section in SS • DEA solution • Internal skimming pot in the Reflux Drum
AMINE REGENERATOR MAIN PARAMETERS: • Rich Amine / Steam ratio in the Reboiler • Acid Gas to SRU temperature = 55°C • Regenerator Reflux Drum pressure = 0.9 kg/cm2 g • Rich Amine to Regen. = 93 °C • Temperature of lean amine solution sent to Storage and delivery section (92°C) • Demi Water make-up to reflux drum MAIN LIMITATIONS • Amine degradation • Antifoam solution needed • OPERATING CONDITIONS
AMINE SUMP DRUM MAIN FEATURES • Pure DEA loading facilities • Blanketed with inert gas • Installed inside pit
AMINE SUMP DRUM • MAIN LIMITATIONS • Amine degradation • OPERATING CONDITIONS • Temperature: 55 °C • Pressure:0.1 kg/cm2 g
STORAGE AND DELIVERY SECTION MAIN FEATURES • Blanketed with inert gas • Air louvers
STORAGE AND DELIVERY SECTION MAIN PARAMETERS: • Temperature of lean amine solution sent to HCU Section (55°C) • Amount of amine sent to filtering system (around 15%) • Amount of cold lean amine sent to Scrubber on Rich Amine Flash Drum (around 1.5 m3/h) • OPERATING CONDITIONS MAIN LIMITATIONS • Amine degradation
MAIN EQUIPMENT DESCRIPTION SWS IS EQUIPPED WITH THE FOLLOWING MAIN EQUIPMENT: • SOUR WATER FEED SURGE DRUM • SOUR WATER STRIPPER
SOUR WATER FEED SURGE DRUM MAIN FEATURES • Internal skimming pot • Blanketed with inert gas
SOUR WATER FEED SURGE DRUM MAIN PARAMETERS: • Pressure controlled • OPERATING CONDITIONS
SOUR WATER STRIPPER MAIN FEATURES • Valve type trays • Chimney tray (top and bottom) • Top section in SS
SOUR WATER STRIPPER MAIN PARAMETERS: • SW Acid Gas to SRU temperature = 85°C • Sour Water to Stripper = 84 °C • Temperature of pumparound return to Stripper = 65°C • Temperature of stripped water sent to HCU/DHT = 90°C • Temperature of stripped water sent to WWT = 40°C MAIN LIMITATIONS • Surface temperature of the acid gas line • OPERATING CONDITIONS