450 likes | 556 Views
Newsprint Module Changes. PO Working Enhancement Few New Reports Data Amendment Utility . Enhanced Imported PO Entry Form. Imported Dispatch Schedule Entry. Enhanced Indian PO Entry Form. Indian Dispatch Schedule Entry. PO Amendment Form. PO Cancellation Form.
E N D
Newsprint Module Changes • PO Working Enhancement • Few New Reports • Data Amendment Utility
Enhanced Imported PO Entry Form. • Imported Dispatch Schedule Entry. • Enhanced Indian PO Entry Form. • Indian Dispatch Schedule Entry. • PO Amendment Form. • PO Cancellation Form. Newsprint PO Working Changes
Newsprint Imported PO Changes • Remove Detail Part where we make dispatch schedule entry.
Imported Newsprint Dispatch Schedule • Query upper block after that entry in detail block.
Indian Newsprint PO Entry Form Before 2
Remove Weight , Quality, GSM from detail block. • Gross Weight will be update when receive truck as per dispatch schedule. Indian Newsprint PO Entry Form
PO Report for Ex-Mill & CI Billing Terms • It shows Width wise rate because freight not included in vendor invoice.
PO Report for C&F & CIF Billing Terms • It shows Centre width wise rate because freight included in vendor invoice.
Indian PO Dispatch Schedule • Query in first block. • You can’t schedule greater than 3 trucks in a day. • Back Date Schedule not allowed. • Centers which entered Rate defined in PO entry.
Gross weight is disabled. It is calculated according to PO which is not received. PO Amendment Utility Imported PO Amendment Indian PO Amendment • After Amendment Approval is required.
In this form PO maximum amendment number shows only. PO Cancellation Utility Indian PO Inactive Imported PO Inactive
Current date GR Entry Changes allowed at your end. GR Entry Enhancement • Only Authorize person make new Inter official loan entry i.e. Reels Received from Job Work or Excess found in physical verification.
Data Amendment Utilities • Reels Issue Amendment / Deletion. • MRR Entry Deletion. • GR Entry Amendment after current Date.
Forthcoming Module Changes • Machine Room Return Entry Form Changes • Newsprint Advance/CA/DA Payments.
Machine Room Return Changes • Changes in Reason not allowed.
WASTAGE MODULE Enhancements
Wastage Enhancements Enhanced Enhanced Enhanced Enhanced
Added Detail Block in this form. To control Sale, Stock, • Issue, Generation, Width, • Piece etc. Wastage Master Changes • Detail Block, We shall insert the attributes according the waste nature. Like Sweeping , we insert stock required to make weight required . New
LOV in Machine No field enhance. Now LOV contains CTP machines also. So that we can feed generation separate for their waste. Enhanced Wastage Transaction Changes Enhanced • Core/Pcs field will required in case of Aluminium sheets feeding. New • Added New field named Wastage From (place_cd). So that we can know about generated waste that is came from.
In case Alum Sheet Weight automatic calculate by master after enter the Pcs And only those items will show which have Issue required in Waste Master Detail. Wastage Transaction Changes • Total Gross Weight can not be greater than DharamKanta Weight.
In case Alum Sheet Weight automatic calculate by master after enter the Pcs And only those items will show which have Sale required in Waste Master Detail. Wastage Transaction Changes
Wastage Report Changes • In option Wastage Reports, we added one new report. • In option Divisionwise Wastage, we enhanced one report and added two new reports. Enhanced Enhanced
New Wastage Report Changes
Two new reports are introduced at first time. • Option are 1) Division wise closing stock – printed raddi & sweeping . 2) Division wise closing stock - Thabba Wastage Report Changes New • Enhanced the report – NPT_WASTAGE_MIS of option WASTAGE MIS. Sweeping + Packing Material, ThabbaInd, ThabbaImp, Printed Waste & Their Percentage Column introduced in this report. Exclude Aluminum waste. Enhanced
Wastage Report Changes • If select option One Divisionwise closing stock – Printed raddi & Sweeping . Then feed only as on date for closing stock. New
New Wastage Report Changes
Wastage Report Changes • If select option Two Divisionwiseclosing stock – Thabba. Then feed as on date and select waste which you want for closing stock. New
New Wastage Report Changes
Wastage Report Changes • If select option –WASTAGE MIS. Then feed from date and to date which you want for Wastage MIS. Enhanced
Now Wastage Verticals Data i.e. I-Next, Josh etc. would be auto transferred respective their JAGRAN Unit at time of generation feeding. • Vertical Stock Ledger closing should be always Zero. • Receiving not required which data auto transfer. Wastage Vertical Data