Corvallis Mountain Rescue Unit 2010 Snow Re-Accreditation

Corvallis Mountain Rescue Unit 2010 Snow Re-Accreditation . March 20, 2010 Hayrick Butte. OERS # 2010-0583. Highlights of Gear Changes. Blue plastic guard added to head of new litter. Triple length slings now Dog ‘ n Tails Extenders. Only one spacer now on brake bar racks.

magar
Download Presentation

Corvallis Mountain Rescue Unit 2010 Snow Re-Accreditation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corvallis Mountain Rescue Unit2010 Snow Re-Accreditation March 20, 2010 Hayrick Butte OERS # 2010-0583

  2. Highlights of Gear Changes • Blue plastic guard added to head of new litter. • Triple length slings now Dog ‘n Tails Extenders. • Only one spacer now on brake bar racks. • Butterfly top loop enlarged on litter front bridle. • 2nd rigging plate added for belay to each station. • Consider packing evac stations with gear on the plate. • Pre-rigged radiums are on both racks for recert.

  3. Personal Gear • Large pack • Shovel (and extra if have) • Probe (and extra if have) • Beacon (and extra if have) • Personal anchoring • Supplements to Unit gear rack • Minimum gear list items

  4. Schedule • 0700 hrs: CMRU truck on location • Truck parked in same place as our last trainings, above the Hoodoo Shops and below the tubing area. • 0800 hrs: Evaluators Meet near tubing area • 1000 hrs: Deschutes Exam Begins . • CMRU members are encouraged to watch from a distance and learn • 1200 hrs: Deschutes Exam Ends • 1300 hrs: CMRU members please be at Hoodoo • 1330 hrs: CMRU members meet at CMRU truck • 1400 hrs: CMRU Exam Begins • ~1630 hrs: CMRU Exam ends • ~1700 hrs: OMRC meeting and BBQ (please bring something to share) • all members invited and encouraged to attend • Location: 2ndflr of Hoodoo Ski Patrol Lodge • Members invited to spend night in Ski Patrol Lodge if they wish

  5. CMRU ICS Structure(tentative based on problem)

  6. CMRU ICS Structure(tentative based on problem)

  7. What’s the ICS reality? Situation Specific, Site Command’s Call.

  8. Unit Equipment

  9. Comms Plan • Primary Freq: CMRU 155.160MHz • Secondary Freq: Oregon SAR 155.805MHz • Tactical Freq: BC SAR 155.745MHz Radio Assignments: • Hasty Team: Matt, Nate, Jim • Team 2: Jerry, Melissa, Tim (personal) • Team 3: Jonathan, Jason, Ellen (personal)

  10. Things to Think About • This isn’t a race. • Be prepared on a personal level. • Watch out for others. • Get Reporting Party to Bob/Todd. • Remember chain of command. • Be proud and have fun!

  11. What Else ?