Iowa DOT Developmental Specifications for Recycled Asphalt Shingles

Iowa DOT Developmental Specifications for Recycled Asphalt Shingles. Scott Schram, Ph.D., P.E. Iowa DOT Bituminous Engineer 5/26/2010. Outline. Background Specification Development Upcoming Projects. RAS Processing Models. RAS Processing Models. RAS Processing Models.

magda
Download Presentation

Iowa DOT Developmental Specifications for Recycled Asphalt Shingles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Iowa DOT Developmental Specifications for Recycled Asphalt Shingles Scott Schram, Ph.D., P.E. Iowa DOT Bituminous Engineer 5/26/2010

  2. Outline • Background • Specification Development • Upcoming Projects

  3. RAS Processing Models

  4. RAS Processing Models

  5. RAS Processing Models

  6. RAS Processing Models

  7. Jurisdiction DOT DNR IDED OSHA

  8. DOT Specification Development • Source requirements • Material requirements • End User requirements

  9. Source Requirements: RAS Suppliers • Treated like aggregate producers • RAS comes as a CERTIFIED product to End User • Approved List for RAS Suppliers (each site) • Obtained necessary permits • Submit Quality Control Plan • Documentation and record keeping

  10. Material Requirements • Raw Shingle Material • Pre-processing = sorting, removal of waste • Asbestos remediation (testing, rejection of loads) • Processed RAS • Gradation • Deleterious Content (<1.5%) • Moisture (for information only)

  11. Quality Control of RAS • Code of Federal Regulations 637.201-637.209 • RAS cannot be self-certified • QC Program Required • Minimum 3 samples or 1/1000 tons • Gradation, deleterious, moisture • DOT may verify results

  12. End User Requirements • 2-5% of RAS must be used when the DS is on the contract • Future…….Permissive specification allowing 5% max • We pay for 2/3 of the extracted binder content in the RAS • End Users may not collect or process shingles at portable facilities.

  13. Other issues • Sampling and testing logistics • Timing • Mix Design volumetrics

  14. 2010 Projects • HWY 63 • HMA: 4% + RAP = 25% binder replacement (PG 58-28) • HMA: 5% + RAP = 30% binder replacement (PG 58-28) • HMA: Control with RAP • HWY 10 • HMA: 4%, 5%, 6% with NO RAP (PG 58-28) • HMA: control with NO RAP (PG 64-22) • HWY 61 • WMA: 5% + RAP = 30% binder replacement (PG 58-28) • WMA: 7% + RAP = 30% binder replacement (PG 58-28) • WMA: control with RAP only (PG 58-28)

  15. QUESTIONS?