Status and Progression of “DCMF Potential DCUSA Modifications”

Status and Progression of “DCMF Potential DCUSA Modifications” Distribution Charging Methodologies Forum 6 th January 2011. To date there have been 23 potential developments to the CDCM identified and raised at DCMF

magda
Download Presentation

Status and Progression of “DCMF Potential DCUSA Modifications”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status and Progression of “DCMF Potential DCUSA Modifications” • Distribution Charging Methodologies Forum 6th January 2011

  2. To date there have been 23 potential developments to the CDCM identified and raised at DCMF These include the areas of additional work and development identified by Ofgem in their November 2009 CDCM Decision Document Since the last DCMF the DCM Sub-group has Identified the current status of the 23 potential developments Identified overlaps both within the 23 and with current work being undertaken elsewhere Assigned a DCM lead to all of the potential developments not being progressed elsewhere DCM Sub-group to date

  3. Current Status of the ’23’ 3 | Energy Networks Association

  4. DCM Sub-group Leads 4 | Energy Networks Association

  5. Next Steps DCM Leads to progress development of their respective areas by: Preparing a high level development brief for circulation to DCMF/SIG Discussing ideas with proposers, other DNOs, IDNOs, suppliers, etc. Collecting data and conducting modelling work (where practical) Preparing scopes of works where the involvement of external consultancy resourcing is appropriate Any spend is subject to approval by COG Reporting back to the DCMF/SIG on progress and results We await guidance and/or prioritisation from the SIG! 5 | Energy Networks Association