An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia

  2. IG meeting agenda – 1

  3. IG meeting agenda – 2

  4. Action Points 1-3 of the last IG meeting

  5. Action Points 4-6 of the last IG meeting

  6. IG meeting agenda – 1

  7. Best-practice standardised bulletin board • What was expected: • Implementation of an online, user-friendly, and secure trading platform. • implementation of an online platform using a harmonised standard (best practice TAG) for transmission capacity on all major transit systems of the region SEE

  8. Example to be used for all Austrian transit capacities

  9. * Harmonised Bulletin Board (3) • TAG Bulletin Board * Optional information may be in the form of an attachment or as directly published text

  10. Action POINT 1 - Best-practice standardised bulletin board • Suggested next steps • Coordinator: TAG • Action Point from last IG meeting: • Implementation of the standard content until next IG meeting • Next steps: • Preparation of guideline for the standard bulletin board by TSOs • RCC to comment on guideline before implementation • Role of RCC to monitor implementation

  11. IG meeting agenda – 1

  12. Summary of planned investments in the region • First analysis • Natural gas demand growth: Where data have been submitted, there is an indication of growing natural gas consumption up to 2015 • This is the case in eg: Austria, Czech Republic, Italy, Slovenia, Poland • Infrastructure investment • At the TSO level: • Building activity in the region mainly as reinforcement, only little or few true new projects • Examples: TAG compressor stations, reinforcement in Italy • New infrastructure in Czech Republic and Italy • At the SSO level • Both expansion and new projects • Examples: Expansion: 2 projects (A), Virtual storage (CZ), expansion (I, P), new capacity: A, CZ, H, I, P, Rom, Sl (preliminary analysis)

  13. Summary of planned investments in the region • Implications of findings • Natural gas demand growth seems unquestionedin line with: rising energy demand, economic growth etc. • Expansion/new infrastructure mainly in storage areaFewer infrastructure projects in terms of volume • However: Infrastructure projects might not ‘come online’ until 2010-2015 • From a regulatory viewpoint:Issue of capacity shortages unsolved • Clear acknowledgement:SSE region affected by capacity shortages in a heterogeneous manner: • North of the region (Poland, Czech Republic) different from Southern part (Austria, Italy) • Impact of LNG both in the North (Poland) and South (Croatia-Italy-Austria) [potentially]

  14. Summary of planned investments in the region • Further analysis: • Pipeline capacity: Is there enough (cf. rout assessment)? • Congestion scenarios 2010, 2015, 2020 • Expansion projects till 2020 • Storage capacity: A flourishing market-but how much capacity will be available to the market? • Congestion scenarios 2010, 2015, 2020 • Expansion projects till 2020 • Market needs till 2020 • Impact of LNG: What will it be? • Projects that have an influence on the region

  15. Summary of planned investments in the region • Further data needs and next steps • NRAs to complete natural gas demand forecast (national level) • RCC to ask shippers and traders (EFET and EURELECTRIC) to submit their estimates regarding natural gas demand per country in the region • RCC to ask TSOs and SSOs to cross check the information provided and update it if required

  16. IG meeting agenda – 1

  17. IG meeting agenda – 1

  18. Removing remaining obstacles to implementation of IPA/OBA

  19. Action Point 3: Removing remaining obstacles to implementation of IPA/OBA • Suggested next steps Affected TSOs Action Point of last IG meeting: • CEGH will coordinate a solution for Baumgarten within the next 3 months and present the results at the next meeting Next steps: • CEGH to outline barriers for conclusion of IPA/OBA at Baumgarten Timing: • CEGH and involved TSOs to conclude IPA/OBA until the end of 2007

  20. IG meeting agenda – 1

  21. Best practice provision of OSS service • What was expected: • Practical implementation of a voluntary one-stop-shop (OSS) service based on the recommendations of the OSS study • Information requirements • Capacity information • Cumulative transportation tariff for the requested route • Contract information to be signed with different parties • Service fee for the OSS service

  22. Action Point 4: Best practice provision of OSS service • Suggested next steps • Coordinator: RWE TGN / OMV Gas • Next steps: • TSOs of the region are invited to participate in the GATRAC platform • TSOs offer OSS service to shippers who request the service according to best practice OSS (www.gatrac.com, OMV Gas) • Timing: update next meeting • Role of RCC to monitor implementation

  23. IG meeting agenda – 1

  24. IG meeting agenda – 1

  25. IG meeting agenda – 2

  26. IG meeting agenda – 2

  27. IG meeting agenda – 2

  28. Action Point 6: Hub development as regional balancing market (I) • Suggested next steps • Lead: PSV/EFET and CEGH/EFET • Next steps: • Separate workstreams and update on implementation of next steps according schedule • Timing:

  29. Action Points 1-3

  30. Action Points 4-6

  31. IG meeting agenda – 2

  32. Any other business-AOB Proposed date of next meeting • Suggestion: Next meeting (SG meeting) end of January 2008 • Key: Progress report and participation of stakeholders • Regulators only to facilitate the process • Context of regional activities • Next Madrid Forum on 16th/17th October 2007 • ERGEG to report on progress • Update on issues regarding transparency (Outcome of recent survey)