FURNITURE SALON Author of the slides: Andrzej Marynowicz , Opole University of Technology Case study no. 7. Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies. Content of slides. 1. General information 2. Investment design
E N D
FURNITURE SALONAuthor of the slides: Andrzej Marynowicz, Opole University of TechnologyCase study no. 7 Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies
Content of slides • 1. General information • 2. Investment design • 3. Bearing system • 3.1. Foundation • 3.2. Carrying elements • 3.3. Casing elements • 4. Computational models used • 5. Actions on structures • 6. Project documentation, plans, and drawings • 7. Erection • 8. Interesting construction details • 9. Protection from weather effects
General information • date: 04.04.2007, • price: ca. 2 000 000PLN (ca. 525 000 euro), within ca. 450 000PLN (ca.120 000 euro) for timber structure, • investor: KOMFORT Sp. z o.o. Szczecin, • design studio: PPB – Pracownia Projektowania Budowlanego s.c. Opole, • construction company: Holzbau Wehmeyer sp. z o.o., • location: Poland, Opole, Horoszkiewicza street, • surroundings: general service buildings, • materials used: glued timber, multilayered casing, concrete elements, brick-made walls
Investment design • one of the furniture trading networksalons • a large working space
Bearing system • foundation
Bearing system • carrying elements
Bearing system • casing elements
Computational models used • rigid support frames with free-ends beams
Actions on structure • typical according to polish standards – PN • snow • constant loading of roof (including ventilation devices), floors and walls casing, • variable loading of mezzanine: qk=2,5kPa. • moreover, the ground-floor was designed for variable operational loading q=15kPa.
stairs mezzanine Project documentation, plans, and drawings
stairs roof bracing
Erection • earth work – foundation digging • spot and continuous footings • columns and its supports • frame beams • brick-made staircase and concrete stairs • roof covering • light-walls casing • finishing work
Protection from weather effects • fungicide and insecticide media for timber • additional coatings during erection
Thank you for your attention! http://fast10.vsb.cz/temtis/en/