40 likes | 136 Views
Spectrograph Workshop. 9-13 / 12 / 2002. Spectrograph Development. Technical Development by June 03 French review by Summer 03 (with external committee) Refining Costing and phase B/C/D strategy by Dec 03 (Alcatel – Astrium) Negotiation with CNES/CNRS DOE review 07/04.
E N D
Spectrograph Workshop 9-13 / 12 / 2002
Spectrograph Development • Technical Development by June 03 • French review by Summer 03 (with external committee) • Refining Costing and phase B/C/D strategy by Dec 03 (Alcatel – Astrium) • Negotiation with CNES/CNRS • DOE review 07/04
Technical Development • Optical Design (12/02) Done • Simulation Software – PSF library 1st Version • Zemax tolerancing 1st result • Opto-mechanical design Started (04/03) • Tolerancing (simu. Soft) Started (01/03) • Performance Analysis Started (06/03) • Control Hardware (Slow control) (06/03) • Focal plane preliminary design (06/03) • Instrument observation scenario (04/03)
Instrument Interfaces • Optical Interfaces (With Telescope & SNAP Calibration) • Mechanical Interfaces (With Focal Plane structure) • Thermal interfaces (With radiator and Focal plane structure) • Control Hardware Interface (Slow control – With OCU) • Data Acquisition Interface (With Data Acquisition System)