An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optimization of future altimeter orbits

  2. Outline • Introduction • Synthesis of main previous results and studies • Detailed presentation of WP4000: Impact of orbit choices on main applications • Mission costs • Precise Orbit Determination • Mesoscale • Climate • Mean Sea Level • Suitability of selected orbits in a Wide Swath configuration • Conclusions

  3. Introduction • Objectives: • Propose Post-EPS altimeter orbit candidates for 2020 and onward (Jason-CS, Jason-4) • Nadir altimeter • High resolution • Reference mission • Methodology • Generation of a wide range of orbit candidates (altitude, inclination and period ranges) • Pre-selection of Post-EPS altimeter orbit candidates according several criteria (tides, High frequency signals, climate, altitude …) • Assessment in a multi-satellite context (purely geometrical sampling analysis) • To filter out suboptimalorbitchoices (e.g.: no S3A / S3B redundancy) • To highlightpotentially optimal choices • Evaluation of impact of orbit candidates on different application • Tides and HF • Mesoscale observation • MSL trends • Climate • SWH, hydrology, Ice • POD • Costsevaluation

  4. Support from domain experts • Tides: • Aliasing • Observability and separability • R. Ray (NASA/GSFC), F. Lyard (LEGOS), C. Perigaud (JPL), R. Ponte (AER), F. Lefevcre (CLS) • High frequency atmospheric signals: • Crucial issue in terms of errors for altimetry • R. Ponte (AER), C. Perigaud (JPL) • Climate signals (ocean/atmosphere): C. Perigaud (JPL) • Ocean circulation and mesoscale signals: Mercator-Ocean (Y. Drillet, O. Le Galloudec), P.Y. Le Traon (Ifremer) • Mean Sea Level: A. Cazenave (LEGOS) • Dedicated meetings: • At Eumetsat premises (Tides, HF signals) • During the Nice OSTST meeting (tide aliasing) • Internal meetings with experts at CLS

  5. Dedicated tools for the study

  6. 1- Pre-selection of orbit candidates Global recommendations from analysis of passed and planned altimeter missions Optimisation of orbit geometry Altitude between 800 and 1400 km (Berthias 2008) Air-drag and solar radiation exposure trade-off Repeat cycle between 10 and 35 days Ocean mesoscale signal observation Long term continuity challenge High inclination to get more polar ocean observations No sun-synchronous orbits => > 22000 potential orbits Need to make drastic selection to extract a few suitable orbits for Post-EPS Tide aliasing, Climate, Mesoscale, Costs issues

  7. Strong tide aliasing criterion : Good alias is > 2 cpy 14 tidal waves are studied : main+non-linear components Very few orbits meet these criterion Tide aliasing criterion relaxed : We admit some aliasing below 2 cpy S1 alias > 2 cpy (= precession rate; Nerem 2008, Ray 2008) K1 wave aliasing is a priority K1 alias > 2 cpy or not good separation with Sa and Ssa signal (< 2-3 years) Recommendations for climate purposes : Avoid the aliasing band [4-9 cpy] Avoid aliasing at 3 cpy and 6 cpy (60 and 120 days signal) No alias at annual or semi-annual frequencies Mesoscale observation: Scales of ~150 km and ~15 days. 3 days and 4 days sub-cycles preferred Low altitudes preferred to reduce mission costs Orbit selection criteria

  8. Post-EPS orbit candidates

  9. 2- Assessment in a multi-mission context • Pulse-limitedaltimeters • Operational missions • Near Real Time use (idealcoverage, no onboardanomaly, perfectdeliverywithoutanyadditionaldelay…)  Best case NRT • Samplinganalysis (purelygeometrical, no OSSE) • No universal optimisation : • Depends on contemporaneousaltimeters • Optimal phasingis not possible unless all altimetersfly on a similarorbit • Only a trulyoptimised constellation yields a significantlybettersampling • But itis possible to have a verypoorsampling (muchredundancy) • Depends on the space / time correlationscalesanalysed • Optimisation islimitedwithoutperfectphasing (e.g.: Jason + TP) • Analysislimited to the signals… • Whichcanbe (reasonably) resolved by multi-satellite altimetry • Still as small as possible  7-15 days, 75-150 km

  10. Base metrics • Coverage • Observable scales (quickview) • Sampling quality and homogeneity • Structure detection and long-term monitoring • Cross-overs and cross-calibration

  11. Coverage • Seaiceignored • Groundtrackdensity (ocean) and rivers / lakesactuallyflown over are neglected (theoreticalcoverage) • Similaranalysis possible on icewithicecoverageclimatology

  12. Sampling scales • Eachorbit has 3 important figures in terms of samplingscales • Altitude (number of revs per day, lower altitude isbetter) • Cycle duration (space vs time trade-off) • Sub-cycle duration(scanning pattern and SWH applications) • Ex for the Jason orbit: • 315 km (worst case)at cycle scale, • 280 km if looking fornearest orthogonal point at 66° inclination • 3 x 945 km scans fromthe 3 daysub-cycle

  13. Evolution of the cross-track distance as a function of observing duration • J1+TPN best for 7-12 days • A926bis and A923 can resolve smaller scales for 1-3 days time scales • A926bis, A801 and A1104 can resolve smaller scales for longer period >12-13 days (= mesoscale observation) • A1104 is bad for periods below 11 days • A878 is good for 9-10 days periods

  14. Sampling quality & homogeneity • Approach • Use actual correlation scales of mesoscale observed (without OI) • For each time step, compute a map of the best correlation between observation (along-track point from each satellite) and unknown (grid point) • Analysis limited to the lowest inclination boundary • Classification • Quality indicator (blind to good) built from correlation • Arbitrary thresholds but results are not much sensitive to this choice

  15. Page 15 Instantaneous correlation • Instantaneous correlation between available NRT measurements and a random day • Scanning patterns and optimisation are visible • Allow building the qualityindicator • The maps’ space/time variations give info about the space/time samplinghomogeneity of the constellations. S3+A1104 S3+J1 S3+A878 J1+EN

  16. 2 Sats  20 % of the Atlantic is not correctly observed (Class 1 & 2) • 4 Sats  less than 8% • S3+A878 slightly better, S3+A801 equivalent to J1+EN

  17. Page 17 • Validation of the method = equivalence to LD2002 • Mapping error given to each class (based on covariance thresholds) • Compute sum of class error weighted by percentage of points in class • Roughly equivalent to results fromLD2002 •  Crude simulation but the optimisation potential for multi-satellite maps is accessible

  18. Structure detection and long-term monitoring • Application need : • to detect new features (or a change in shape/intensity) as fast as possible • to monitor them as long as possible (tracking) • Scalesneeded for SSH : ideally75 to 150km (or as small as possible for conventional altimetry) • Approach : purely geometrical • To be detected, a feature must have an observation within 2.dx/3 of its central location • To lose tracking, a feature must have no observation within 2dx/3 and 2dt/3 • Simulations are run over a few weeks • For each snapshot : if simulated altimeter data are within the scan bubble, the feature (grid point) is detected/tracked • Statistical approach (results averaged over the entire Atlantic = probability for a random sample if the distribution is reasonably uniform) • Stationary assumptions acceptable (no strobo-scopy possible with scanning patterns) 2 weeks

  19. Detection capability • From 2 to 4 satellites : miss probability of 16 to 4% after 5 days • Still 38% miss chance after 3 days for only 2 satellites (optimised or not) • 3 or 4 satellites needed to detectfastenough for NRT applications

  20. DetectionCapability and Monitoring Probability to miss a new 150km wide feature (left) and to lose the tracking (right) on a 150km wide feature for 2 satellite constellations with post-EPS candidates and references scenarios • J1+TPN has the lower probability to miss a new feature after 5 days • S3+A926 and S3+A923 show similar performances for mesoscale structure detection and monitoring: both have better detection performances than J1+EN and S3+J1 for scanning times between 3-7 days (both have 4-days sub-cycle), and have similar monitoring performances to S3+J1. • S3+A923 is very good for 14 days signals due to its short repeat cycle (9 days). • S3+A1104 shows bad performances both for detection and for monitoring of mesoscale. • To detect new or modified features, all configurations cannot compete with true optimisation.

  21. Crossovers • Crossover angle (or track angle to equator plane) = impact on geostrophic velocity observations • 45° track (90° crossover) = isotropic velocity obs • Lower cross angles create better observations on U and worse on V • Latitudes of 40-50°: J1, GFO, A878, A926 • 45-60° (ACC) : A801 • A878, A926 : crossovers at most latitudes and a reasonably uniform distribution • A801 has many but aggregated crossovers  problematic correlation of local (solar) time • A1104 : few and not uniform

  22. 3 orbits selected • A878_i66_c10 (~878 km, ~66°, ~10 days) or A878 • basically equivalent to a Jason orbit, but in a 850-900 km range (139 revolutions per cycle vs 127  10% denser sampling than Jason) • sub-cycle duration is different : 1 day vs 3 days • scanning over 3000 km (with a resolution of 300km) without any interlacing • A926_i67_c13 or A926 • it has a GFO-like repeat cycle and a T/P-like inclination • Sub-cycle duration is 4 days • interlaced scans of 3000km at a resolution of 750km, every 4 days • A801_i71_c22 or A801 • a longer repeat cycle of 22 days and a 7 day sub-cycle • 3 interlaced eastward propagating scans performed within a given cycle • spatial resolution of these sub-cycle scans is roughly equal to 430km

  23. Preliminary conclusions • A comprehensive methodology has been followed: • Dedicated tools have been developed (orbit and ground track generation, assessment with different metrics) • A method has been put in place, taking into account different criteria • Estimation methods depending on the applications, from the simplest to the more sophisticated • Expert support and collaboration for each domain of interest • A robust protocol: • Validated against other methods • Could be easily re-used: • With any other different hypotheses (mission requirements) • In other satellite configurations (single satellite, constellation...) • Could even be improved (assimilation experiments...) • Good starting point for future extensive definition study

  24. Preliminary conclusions • Lower altitudes (than 1330 km) are possible for the future high precision altimetry missions • 3 orbits have been selected and assessed (though many other orbits could be envisioned) • Comparable results with Jason, or even better • Results depend on the application specificity (mesoscale, climate, Mean Sea Level) • A926_I67_C13 seems a good trade-off, A878_I66_C10 better for climate studies • Compatibility with the Sentinel-3 mission • These orbits should be compliant to POD requirements, but requiring optimised configuration (platform and payload) • Mission lifetime should be improved while cost would remain constant (worst case) • A synthesis report will be produced presenting different trade-offs