Budget LAL Pixel 2012-2013 R&D Tracker

Budget LAL Pixel 2012-2013 R&D Tracker. A.Lounis , N. Dinu , V. Linhard , A. Bassalat *, Ali Harb , Evangelos -Leonidas Gkougkousis , A. Falou * Gisèle Martin- Chassard , D. Thienpont , J. Tong Bong, B. Lachasinski. Pôle OMEGA. * Permanent at CERN (IBL construction).

maili
Download Presentation

Budget LAL Pixel 2012-2013 R&D Tracker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Budget LAL Pixel 2012-2013 R&D Tracker A.Lounis , N. Dinu, V. Linhard, A. Bassalat*, Ali Harb, Evangelos-Leonidas Gkougkousis, A. Falou* Gisèle Martin-Chassard, D. Thienpont, J. Tong Bong, B. Lachasinski Pôle OMEGA * Permanent at CERN (IBL construction)

  2. Bilan-2012 R&D Pixel planaires 2012: 10 K€ VTT Edgless detectors (35 x200 um) Run sensors : received Oct 2012

  3. Budget 2013 3D- ASIC Chartered Tezzaron Via CMP 3 K€ Test card Omegapix2/Edgless (VTT pixel) + Omegapix2/Slim Edge (Cis Pixel) SENSOR tests Carte Front-End Omegapix2/Pixel Matrix 3K€ 65 nm electronics : Building block design March 2013 (LAL, LPNHE,LAPP, INFN, … CERN)  CERN financement Asic 65 nm Test card 3K€

  4. Pôle OMEGA Test Card MemDyn Test Card OMEGAPIX

  5. R&D on TCAD and doping profile activities Synopsis TCAD 3D simulator 1500 € + 900 € (2 licences) Simulation TCAD : 2.4K€ Doping profile measurements using AFM method (Laboratoire IEF Orsay + CNRS MEUDON) AFM + SIMS : 3 K€

  6. R&D developments Planar Pixel sensor Edgless R&D, tests structures LAL, MPI, Dortmund, Glasgow 10 K€ ASIC Test cards and Front-End test cards 9K€ 3D Simulator 2.5 K€ Doping profiles evaluation 2K€ Inter-connexions ASIC + Pixel Matrix (20 K€) 43,5 K€ Run Omegapix2 Dec 2012 ANR Vitesse (~75 K€) Inter-connexions Omegapix2 Dec 2013 ANR Vitesse (~XXK€)

  7. Futur developments on active edges • EU request • Duration: 3-4 years • - 500 KEuro, mainly for 4-5 consecutive production runs at VTT comprising sensor productions and interconnection to the read-out chip. • - 4 Ph.D. students Appeld’Offre CAPTINOV PlateformeCapteursInnovants SESAME / region ILE DE FRANCE (LAL, LLR, CEA, ….) Physique des 2 infinis et Astrophysique P2IO 320 K€