1 / 8

Instrument Ground Support Equipment

Instrument Ground Support Equipment. Tai-Hsin Hsu. DPU. ISUAL. PVCFs File. TLMI. CCSDS Packets. Science Display. Science Files. ISUAL DATA FLOW. PVCFs Data. GSE. REVIEW OF REQUIREMENTS. The BITCLK signal shall be sent to the ISUAL BITCLK frequency shall be 1.6Mhz

major
Download Presentation

Instrument Ground Support Equipment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Instrument Ground Support Equipment Tai-Hsin Hsu

  2. DPU ISUAL PVCFs File TLMI CCSDS Packets Science Display Science Files ISUAL DATA FLOW PVCFs Data GSE NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  3. REVIEW OF REQUIREMENTS • The BITCLK signal shall be sent to the ISUAL • BITCLK frequency shall be 1.6Mhz • On ISUAL request (RTS signal) the TLMI shall send the clear to send (CTS) signal. • The length of data format shall be set to 1108 bytes. NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  4. FIFO Actel FPGA ISTM_CLKA DIO Card ISTM_CLKB ISTM_RTSA ISTM_DATA IS_PPSA ISTM_CTSA ISTM_RTSB ISTM_DATB IS_PPSB MIO Card ISTM_CTSB BLOCK DIAGRAM OF TLMI DIOA[7:0] BITCLK DIOB[7:0] RTS DIOC[7:0] CTS DIOD[7:0] DATA GPCTR0 PPS GSE PC DPU TLMI NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  5. PARTS SELECTION • Actel A1020 • IDT 7208 • PCI-DIO-6533HS • PCI-6024E • 26C31, 26C32, 74AC00, 74AC14 • PCI-32 prototyping board NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  6. RELEASED DRAWINGS NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  7. Current Status •  Check BITCLK signal •  Check CTS signal •  Check receiving PVCFs data from DPU •  Receiving 1 PVCF data test • Receiving multiple PVCFs data test NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

  8. RECEIVING 1 PVCF DATA NCKU UCB Tohoku CDR 9 July, 2001 Instrument Ground Support Equipment T-H. Hsu

More Related