1 / 6

START

Attachment A: LN-MMR (Unique) Process Highlights. AFI - REQUESTOR. ABS-CBN PARENT- TECH CON. AFI–PROCUREMENT OFFICER. AFI-ASSET MANAGER. START. A. LN-MMR (Unique). LN-MMR (Unique). LN-MMR (Unique). LN-MMR (Unique). Fill-out LN-MMR (Unique). Review request. Review request.

Download Presentation

START

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Attachment A: LN-MMR (Unique) Process Highlights AFI - REQUESTOR ABS-CBN PARENT- TECH CON AFI–PROCUREMENT OFFICER AFI-ASSET MANAGER START A LN-MMR (Unique) LN-MMR (Unique) LN-MMR (Unique) LN-MMR (Unique) Fill-out LN-MMR (Unique) Review request Review request Check request Not Existing in SAP? Approve? Technical Item? OK to purchase? No No No No B B A B Yes Yes Yes Yes SAP Create New Material Code END B • Notes: • To update the request, the Reviewer/ Approver will resend the LN-MMR (Unique) to Requestor to apply adjustments

  2. Attachment B: Lotus Notes (LN) - Material Master (Unique) Request Save & Forward: Option 1 Save as Draft: Option 2 Material Master Form (Unique) Request Header Plant Code

  3. Sub-Page #1: General Material Information Industry Sector (+) Foundation Industry Sector Material Type Material Type: (+) Donation Items (+) E-Media (+) Fund Raising Items Material Group Purchasing Group Storage Location Sub-Page #2: Material Master Data Information In case of AFI, should indicate the DMS Mat Code (required field for AFI) Old Mat Code • Questions: • In case of new brand, item class, unit of measure or mat type, what request should be needed to prepare? • Size of the attachment file (maximum)

  4. Sub-Page #3: Remarks Requestor Tech Con Reviewer Approver/ Delegator Sub-Page #4: Document History

  5. Attachment C: AFI Plant Codes

  6. Attachment D: AFI Storage Locations

More Related