New TT60 Beam Line for the LHC Phase II Collimation Project - First Ideas -

New TT60 Beam Line for the LHC Phase II Collimation Project - First Ideas -. Christoph Hessler TL Meeting 21.08.2008. Project Objectives. Facility to test: TCDS, TCDQ, TPSG Vacuum windows Collimators phase II (entire collimators and materials)

mala
Download Presentation

New TT60 Beam Line for the LHC Phase II Collimation Project - First Ideas -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New TT60 Beam Line for the LHC Phase II Collimation Project- First Ideas - Christoph Hessler TL Meeting 21.08.2008

  2. Project Objectives Facility to test: • TCDS, TCDQ, TPSG • Vacuum windows • Collimators phase II (entire collimators and materials) • Beam instrumentation (screens, beam loss monitors) • Electronics • …

  3. Beam Parameters • Protons: • Beam energy: 450 GeV (or slightly different 445 GeV) • Pulse energy: up to 2.4 MJ • Bunch intensity: 5.0 · 109 to 1.15 · 1011 • Number of bunches: 1 – 288 • Bunch spacing: ~25 ns • Pulse length: ~ 7 ms • Beam size at target: variable around 1 mm2(Optics tunability: 1s r.m.s. from 0.5 mm - or below, 0.1 mm as suggested by R. Schmidt - to 2 mm?) and possibility to perform elliptical beam. • Heavy ions: • Beam energy: 177.4 GeV/nucleon (36.9 TeV per ion) • Pulse energy: up to 28 kJ • Pulse length: ~12 ms NOTE: present MKE PFNs are capable to extract 7 ms batch length, not 12 ms. To be studied. • Spot size: variable around 1 mm2

  4. Place of Installation SPS TI2 TT60

  5. Beam Line Layout • Basis: Layout of former TT60 beam line as used for T1 • Quadrupole strengths compatible with existing power converters:QTL: |K1| < 0.016 m-2QTR: |K1| < 0.028 m-2 MBB, MBE MBBT QTR QTL Target MBS switching magnets (no fast switching) End of common part with TI2

  6. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 2 mm Calculated values: sx = 1.99 sy = 2.00 ax = 0.00086 ay = -0.01525

  7. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 1 mm Calculated values: sx = 1.00 sy = 1.01 ax = -0.01367 ay = -0.00165

  8. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.5 mm Calculated values: sx = 0.496 sy = 0.499 ax = -0.00439 ay = 0.00696

  9. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.2 mm Calculated values: sx = 0.199 sy = 0.201 ax = -0.00412 ay = 0.02345

  10. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.1 mm Calculated values: sx = 0.100 sy = 0.102 ax = 0.00647 ay = 0.11982

  11. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 2 mm

  12. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 1 mm

  13. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.5 mm

  14. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.2 mm

  15. MADX Simulation Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, beam radius (1s): 0.1 mm

  16. MADX Simulation – Elliptical Beam Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, sx = 0.5 mm,sy = 1 mm Calculated values: sx = 0.497 sy = 1.003 ax = -0.02416 ay = 0.01209

  17. MADX Simulation – Elliptical Beam Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, sx = 1.0 mm,sy = 0.5 mm Calculated values: sx = 0.995 sy = 0.501 ax = -0.03621 ay = -0.01576

  18. MADX Simulation – Elliptical Beam Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, sx = 0.5 mm,sy = 1 mm

  19. MADX Simulation – Elliptical Beam Matching conditions: Initial twiss parameters from TI2 Target: ax = ay = 0, sx = 1.0 mm,sy = 0.5 mm

  20. Outlook • Optimization of beam line geometry to achieve a s of 0.1 mm:Additional space? Additional magnets? • Beam line design: • Switchyard • Beam line (aperture, trajectory correction, stability…) • Magnet specification • Vacuum system specification (chamber dimensions, pumping system) • Survival of exit window • Beam instrumentation requirements • Beam dump • SPS extraction system upgrades • Test set up (O. Aberle):Dimensions, remote handling, general services, beam instrumentation, shielding • Radiological impact – including impacts on ventilation, cooling… • Machine Protection interlocking system • Potential issue: T1 removal (target + shielding) – Residual activation and all RP issues. New space needed: where? How much space? • Propose 2 scenarios for this new beam line + test area: - Scenario 1: cheap (and probably dirty)- Scenario 2: more perfect option