An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4th Railway Package “ Open, Flexible, Interoperable” Carmen Filipescu Director REGIOTRANS Zilele Feroviare Alba Iulia, 9-10 Aprilie 2014

  2. The 3 Pillars of the 4th Package Encourage market by reducing administrative/ technical barriers …by establishing procedures for rail interoperability and safe; Increase the competitive pressure on the market …by opening domestic passenger markets Create a better structures and governance for infrastructures managers …by ensuring non discrimination and a better governance of railway infrastructure;

  3. Content of 4th Railway Package • Directive for modification of Directive 34/2012 “Single European Rail Network” • Regulation for recast of the Reg.1370/2007 “Public service obligation ” • Directive reforming the Interoperability of the railway transport in EU • Directive reforming the safety in the railway • Regulation on European Railway Agency and for abrogation of Reg. 881/2004 • Regulation for abrogation of Reg 1192/69/CEE ,standardisation of the railway undertakings accounts.

  4. 1. EUROPEAN RAIL AGENCY(ERA) New Regulation Additional competences and strengthening power for ERA as “one stop shop” on: • vehicle authorization for rolling stock put in place; • safety certification for railway undertakings; • Consultation / conciliation

  5. 2. OPEN DOMESTIC RAIL PASSENGER MARKETS 2 a ) Open access to the rail infrastructure for the purpose of operating domestic passenger services • Ensure the economic equilibrium of public services where necessary • Compulsory competitive tendering procedure for public services contracts

  6. 2 b ) How to ensure effective competition ? Competent authorities will ensure fair access to rolling stocks so that new entrant operators are able to take part in tender Competent authorities shall make available all information for establishing a bid Positive network effects will be preserved by integrating schemes between operators

  7. 3.BETTER GOVERNANCE FOR INFRASTRUCTURE 3a ) Efficient measures for open access All infrastructure manager functions in same hands ( unified IM ) Coordination body for infrastructure managers and users Establish a network of IMs for international coordination

  8. 3 b) Equal access measures • Institutional separation as a general rule to stop conflicts of interest • Maintaining integrated structures only under strict independence rules for management and financial flows ( “chinese walls “) • Strict process of verification of compliance allowing Member States to protect their market

  9. Compromise voted in TRAN Committee of European Parliament • A)on the governance • Confirmation of unified infrastructure manager • Confirmation of “chinesewalls”for financial flows • On management independence, requirement that railway regulator sets legally guidelines on” chinese walls”

  10. Compromise voted in TRAN Committee of European Parliament B) On Public Service Obligation • PSC directly awarded only if it achives certain efficiency and performance requirements based on Public Transport Plan ( max duration 9 years ) • Tendering obligation from 3 dec.2022 • Direct award to internal operators alsof or regional and national authorities

  11. Bad compromises on : • Governance • ” Ticketing”- generally confused and risky ( except clear provision for integrated sale for PSO) • ENIM • Social conditions ( bad articulation between rules ) • Reciprocity on open acces ( internal/ external ) • Application of public procurement rules…

  12. Interaction between “open access” and ”public service obligation” • Open access should apply on the entire network in every EU Member State • Safeguard the economic equilibrium of the existed public service contracts • Ensuring that national Regulatory Bodies have all means to fulfill in an independent way their responsabilities • For efficiency reasons , bundling viable et non viable services into a single PSO must remain possible • Undercompensation is forbiden !

  13. TIMELINE FOR 2014 …from 1st January 2014 under Greek Presedency … • Early Feb - Council draft agreement on ERA • 25-27 Febr – EP vote in plenary • 14 march – Agreement at the Transport Council …22-25 May …Elections for EP …1 June…Italian Presedency starts Early Sept – Second reading may start