Conventional Pavement Structure. 12.25 inches Asphaltic Concrete Paving. stress. 12.00 inches Graded Aggregate Base. Prepared Subgrade. Inverted Pavement Structure. 2.00 inches Asphaltic Concrete Paving. 6.00 inches Graded Aggregate Base. stress. 10.00 inches Cement Treated Base.
E N D
Conventional Pavement Structure 12.25 inches Asphaltic Concrete Paving stress 12.00 inches Graded Aggregate Base Prepared Subgrade
Inverted Pavement Structure 2.00 inches Asphaltic Concrete Paving 6.00 inches Graded Aggregate Base stress 10.00 inches Cement Treated Base Prepared Subgrade
Inverted Base Construction Asphaltic Concrete Paving Graded Aggregate Base Cement Treated Base Subgrade Minimum CBR Value of 15
Inverted Base Construction Asphaltic Concrete Paving Graded Aggregate Base Cement Treated Base 145 psi to 435 psi Subgrade
Inverted Base Construction Asphaltic Concrete Paving Graded Aggregate Base 86% of Apparent Density Cement Treated Base Subgrade
Inverted Base Construction Asphaltic Concrete Paving For Protection of GAB Layer Graded Aggregate Base Cement Treated Base Subgrade