An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mu2e Conventional ConstructionConventional Electrical Value Engineering Review of Mu2e 2/2013 Randy Wielgos

  2. Mu2e Site Electrical Loads R. Wielgos - VE Review

  3. Conventional Requirements Lighting Assembly/High Bay 85 foot-candles Tunnels 20 foot-candles Automated Controls AC Distribution 120/208 V – 20 Amp Quad Outlet @ 25 Feet 480 V – 60 Amp Welding Outlet @ 50 Feet Standby Power Available R. Wielgos – VE Review

  4. Generator 150kva Elevators, elevator equipment, and elevator machine room/controller cooling. Air handling systems for the ODH. Cranes Sump Pumps. Emergency/StandbyPower Systems Battery Fire detection and alarm systems. Exit sign illumination. Emergency lighting. * Tech equipment requiring UPS will be provided within that Level 2 R. Wielgos – VE Review

  5. Conventional Power Services Above Grade • 13.8 kV Pad Mount Switchgear • Oil Filled Power Transformer • 2000 Amp, 277Y/480 VAC Switchboards • 150 kW Emergency Generator • Power Supply Disconnects Above and Below Grade • Power Distribution Panels (Demarcation w/Exp.) • Welding Receptacles • Lighting Distribution Panels R. Wielgos – VE Review

  6. Electrical Services Beamline PS Disconnect Generator Transformers in Oil Containment Electric Room Panelboard Solenoid PS Disconnect 13.8 KV Switchgear R. Wielgos - VE Review

  7. Electrical Load Model Two Transformers 500 kVA “House Power” 1000 kVA “Power Supplies” R. Wielgos – VE Review

  8. 13.8kV Power System • Expand existing Delivery Ring (PBar) Feeder 24, fed from MSS • Current feeder replaced in 2005 • Second leg to be added Site Prep GPP • Breaker at MSS capable of full anticipated load • Configure system as Sectionalized Loop R. Wielgos – VE Review

  9. 13.8kV Power System Existing: 13.8kV Switch Transformer Feeder & Duct Mu2e AP-10 Proposed: 13.8kV Switch Transformer Feeder & Duct AP-10 MC-1 AP-50 AP-30 R. Wielgos – VE Review

  10. Status Summary • Final Electrical Loading Criteria in Process • 2nd 13.8kV Feeder Cable may be Needed • Options for Building Electrical Service • Two Small Transformers • Smaller Electrical Panels • Separated Loads • One Large Transformer • Future Capacity Benefit • Demarcation with Experimental Equipment Determined R. Wielgos – VE Review