An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FZU participation in the Tier0 test CERN August 3, 2006 chudoba@fzu.cz

  2. Preparation Data transfers via FTS tested using CERN FTS (April 2006) chudoba@fzu.cz

  3. Preparation • Channel FZK-FZU created and tested. Good performance for FZU -> FZK, problems for FZK -> FZU. FZK cloud plans • Tests in the week 5.-9.6. • Each day 1 Tier2 site to test transfers initiated from Tier2, admins from Tier1 available to assist • Once we all have working transferes we could try a simultaneous T1-> All T2's and All T2's -> T1. This could be done over 1 or 2 days. Results • Basic functionality worked • Many problems with performance, stability, site’s availability chudoba@fzu.cz

  4. Example of achieved rates Wednesday 7.6. • 200GB from FZU to FZK via FTS request • Results next day: Done: 92 Hold: 108 Errors: • 25 transfers failed due to my mistake - target file already existed. • 82 Transfer timed out • 1 TRANSFER Operation Timed out During earlier tests the channel FZU – FZK achieved almost 100 Mbytes/s Limited not by network (iperf measurement was done), but by disk servers See wiki pages https://twiki.cern.ch/twiki/bin/view/Main/PragueAndServiceChallenge4ThroughputTests chudoba@fzu.cz

  5. Tier0 exercise • Only datasets copied to FZK were available for FZU • Started 19.6. • 19.6. – 20.6. scheduled downtime at FZK for mw upgrade, later extended to 21.6. evening • 21.6. – CERN – FZK transfers submitted to FTS server at CERN were still ending in the CERN-CERN channel • Which dataset to use? Looking for complete datasets available at FZK: dq2 listDatasetsInSite -c FZKTAPE • 22.6. first subscriptions to FZU (T0.D.run000831.RAW): • Did not succeed • 23.6. (Friday), 17:00: 3 complete datasets at FZKTAPE • 26.6. Fetchers for Tier2’s added to FZK vobox chudoba@fzu.cz

  6. 26.6. first files copied from FZK to FZU using DQ2 • Dataset with RAW data, big files 1.9 GB • 23 Gbytes transferred in 1 hour • Only 4 files copied, the rest timed out during transfer (FTS and disk servers problem), the remaining traffic due to retrials Later a few subscriptions FZK -> FZU, AOD datasets, sometimes failed due to missing source files (automatic deletion after 12 hours) chudoba@fzu.cz

  7. FTS tests FZK - FZU • Transfer of 50 files, each file 1GB • Starts fast, then timeouts occur: • Transfer of 100 files, each file 1GB • Started when load on Tier1 disk servers low chudoba@fzu.cz

  8. Conclusions • We managed to copy a few datasets of Tier0 test data using dq2 • Far from expected rates (FTS tuning and disk servers stability must improve) • Operation requires a lot of effort • Common procedures and instructions for Tier2’s needed chudoba@fzu.cz