“Creation of the Hubble Space Telescope” C. R. O’Dell Observatoire de Paris 3 October 2008

“Creation of the Hubble Space Telescope” C. R. O’Dell Observatoire de Paris 3 October 2008. A highly personal version of the history of the program up through launch. 1923. Hermann Oberth publishes “Die Rakete zu den Planetenraumen”

mandek
Download Presentation

“Creation of the Hubble Space Telescope” C. R. O’Dell Observatoire de Paris 3 October 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Creation of the Hubble Space Telescope”C. R. O’DellObservatoire de Paris3 October 2008 A highly personal version of the history of the program up through launch.

  2. 1923 • Hermann Oberth publishes “Die Rakete zu den Planetenraumen” • In this small book he elucidates most of the modern reasons for putting telescopes in space. • The ability to exploit space for astronomy was and continues to be closely dependent upon transportation.

  3. The Berlin SpaceshipTravel Society

  4. The V2

  5. 1945“Army Surplus” V-2 Rockets come to the US.

  6. 1946 • The first “Think-Tank”, the RAND corporation commissions a study of potential uses of rockets. • Lyman Spitzer, then a 32 year old professor at Yale performs this study. • In this study he proposes building space observatories, leading up to something very similar to today’s HST.

  7. Space Astronomy,The Earliest Years-I • 1957 Soviets launch Sputnik. • 1958 NASA created as the civilian space agency to counter the Soviets. • 1962 The NAS’s SSB identifies as a goal for NASA the creation of a large space observatory.

  8. Space Astronomy,The Earliest Years-II • 1960-1970 Numerous Rockets and Balloons. • 1966 Gemini 11 Objective Prism spectroscopy. • 1968 OAO-A2 launched (Wisconsin & Smithsonian). • 1972 OAO-C (Copernicus) launched (Princeton). • 1973 Skylab Objective Prism Spectroscopy. • 1972 TD-1A (ESA) launched. • 1974 Astronomical Netherlands Satellite launched. • 1978 International Ultraviolet Explorer launched.

  9. 1971-72 NASA begins to consider the HST. • One of the first things NASA did was to establish if the project was feasible (a Phase-A Study). • In parallel with studies by multiple contractors a group of scientists was convened at NASA HQ by Nancy G. Roman to provide feedback.

  10. 1972-3mCrossSection

  11. 1972-3mConfiguration

  12. 1971-72 NASA begins to consider the HST. • One of the first things NASA did was to establish if the project was feasible (a Phase-A Study). • In parallel with studies by multiple contractors a group of scientists was convened at NASA HQ by Nancy G. Roman to provide feedback. • At the end of this study I was nominated by Lyman Spitzer to become the Project Scientist (September 1972).

  13. Lyman Spitzer

  14. Resolutionversus Time

  15. 1973-A broad Scientific Base is established. • In December,1972 NASA issued an AO for creation of Instrument Definition Teams, the leaders plus a few generalists would form a Science Working Group during Phase-B, the preliminary design phase. • This is when the HST began to involve scientists throughout the USA and Europe. • ESA (ESRO) had been after a LAS, which evolved into IUE.

  16. We had $$ problems from the beginning. • The original $300M price-tag was a dictated price. • Different configurations were considered. • Different sizes (1.8-m, 2.4-m, 3.0-m) were considered. • The 2.4-m configuration was chosen in June, 1975. • ESA became a 15% partner in late 1976.

  17. HST CutawayCropped

  18. NBSAxial SI Replacement

  19. SM1Axial SI Replacement

  20. FY1978 HST is given its New Start (Phase C/D) funding. • This was anticipated by the selection of the contractors to build the optical system (Perkin-Elmer) and the overall observatory (Lockheed-Martin). • To the scientists, the greater impact was the selection of science-teams (with associated contractors) to provide the SI’s (scientific instruments).

  21. HST SWGPhase C/D

  22. How was the Science to be Managed? • American Astronomers were used to the national facilities being run by consortia of universities. • KPNO+CTIO-AURA, NRAO-AUI. • The idea of the STScI was first advocated by an ad hoc Ramsey Committee in 1965, before HST was started. • Within the HST project, an STScI was first advocated by the Project Scientist in 1972, eventually this idea was embraced by the Phase B SWG. • A National Academy of Science study in July, 1976 endorsed the concept and NASA reluctantly accepted it. • ESA’s ST-ECF in Garching started in 1984.

  23. Name Changes • 1971 Large Space Telescope • 1975 Space Telescope • 1983 Hubble Space Telescope

  24. WF/PC Prelaunch

  25. OTA Development Problems • The manufacture of a light-weight, highly precise mirror was considered to be an established technology by the project managers. • As the primary mirror was being tested and finished, the FGS was shown to be inadequate. • This all occurred as a new Project Manager came on-board, whose mandate was to control the escalating costs.

  26. Primary MirrorAfter Aluminizing

  27. HST-LMSCHorizontal Move

  28. Schedule History

  29. Launch

  30. HST in Orbit

  31. JAW Cartoon

  32. Spherical Aberration • This was discovered as the first images were made. • The cause was a misaligned optical device used to measure the shape of the primary mirror. • This device made the mirror appear to be flat when it was of the right shape.

  33. The Reflective Null Corrector

  34. The Direct Mistake

  35. Contributing Factors • The primary mirror was not considered the most demanding part of the HST. • The method of testing had become routine. • Management was concentrating on a redesign of the FGS, which WAS new. • The resident MSFC QA person had not been changed. • The report on the anomaly with the alignment was not forwarded to MSFC.

  36. Contributing Factors • The primary mirror was not considered the most demanding part of the HST. • The method of testing had become routine. • Management was concentrating on a redesign of the FGS, which WAS new. • The resident MSFC QA person had not been changed. • The report on the anomaly with the alignment was not forwarded to MSFC.

  37. Servicing Missions • SM1-12/93 COSTAR, WFPC2,Solar Arrays • SM2-02/97 STIS,NICMOS,FGS • SM3A-12/99 FGS,Gyros,Computer • SM3B-03/02 ACS,Solar Arrays,CryoCooler • SM4-10/10 WFC3,COS,(STIS+ACS Repairs),Batteries,Gyros

  38. Scientific Productivity

  39. ShuttleSchedule

  40. Reading Material • “The Space Telescope” by Robert W. Smith. Cambridge University Press, 1989(pre-launch) & 1993(post-launch). • “The Orion Nebula” by C. Robert O’Dell, Harvard University Press, 2003 (Chapter 10). • “The Universe in Mirror: The Saga of the HST and the Visionaries Who Built It.” by Robert Zimmerman, Princeton University Press, 2008.

  41. Don’t you just love a story with a happy ending?

  42. So what has been your involvement since stepping out as PS? • In 1982 launch was expected in 1985 and the PS didn’t have to be at MSFC. • I took a professorship at Rice University in September, 1982. • In 1983 the schedule slipped and MSFC wanted a resident PS. I was unwilling to relocate and stepped out, becoming the Observatory Scientist Team Leader. • After launch, I served on GSFC’s Telescope Time Steering Group, deciding on non-science uses of the telescope in shaking down the problems. • I’ve served on four Science Proposal review panels and currently serve on the STUC. • I retired from Rice in 2000 and relocated to Vanderbilt.

  43. Science Activity • As a Civil Servant who helped select the GTO’s I couldn’t be an early user. • However, in 1984 the Phase C/D science teams all chipped-in a portion of their time and I was made a GTO.This enabled me to have 3 GTO programs. I shared equally my GTO time with Lyman Spitzer. • Since launch, I’ve been PI or co-I on 22 GO programs.

  44. HST in Orbit

  45. O’Dell&Stuhlinger2005

  46. Alice Book Jacket.

  47. Alice and theCheshire Cat

  48. Alice’s Prediction

  49. Proplyds in Orion

  50. 1972-MSFC becomes the Lead Center • The Associate Administrator for Science was convinced that MSFC would do a better job on a task of this magnitude, although GSFC would retain responsibility for the SI’s and operations. • The problem was that MSFC had no optical astronomers. • Stuhlinger approached Spitzer about becoming Project Scientist, which would have involved spending lots of time in Huntsville.