Advanced Lane Following Controller Development Progress Report

Explore the progress in developing a lane-following controller without GPS, achieving minimal steady-state error and overshoot for high-speed navigation. The current status, goals, simulation results, field tests, future work, and timeline are outlined for further enhancements.

manges
Download Presentation

Advanced Lane Following Controller Development Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lane Following Controller11/13/2006 Team 1: Steven Gray, Chris Schantz, Johnny Zhang Team 2: [Mohamed Aly], [Gustavo Costa], Nhattrieu (Tom) Duong

  2. Goals and Objectives • Lateral controller: • Lane following without GPS • Steady State Error < 20 cm • Overshoot < 50 cm • For speeds up to 15 m/s (Advanced Navigation requirement C.5.)

  3. Current Progress - Team 1 • Trajectory Generation

  4. Current Progress - Team 1 • Animation

  5. Current Progress - Team 2 • Trajectory Generation (Take 2) y Alice frame Trajectory waypoints x rAlice(tn) rn(tn) y0 rn,0 x0 Boundary data points Stationary frame

  6. Model and Gain Calculation - Team 1 • Bicycle model (y, θ) • y = Vsin(θ) V = 3.5m/s • theta = Vtan(φ)/L L = 3.5m • Linearize, find characteristic equation: • Det(sI – A – Bk) = s2 - sk2 - 3.5k1 • Relate to s2 + 2ωcζs + ωc2 • Solve for specified steady state and overshoot

  7. Simulation (Follow) - Team 1 • K1 = -0.2857 K2 = -0.4309

  8. Field Test (Thu, 11/9/06) - Team 1 • K1 = -0.2857 K2 = -0.4309

  9. PI Controller (Simulation) - Team 2

  10. Field Test (Thu, 11/9/06) - Team 2

  11. Future Work • Implement PID controller in Follow • Improve MATLAB model • Add time delay • Add disturbances • Relativistic effects • Trajectory Generation • Deal with noise • Accommodate rough data

  12. Timeline • 11/19/06 - PI controller implementation • 11/26/06 - Lane data simulator given traj file • Load traj file and generate simulation data • Filter noise and rogue or missing data • 12/02/06 - Improved MATLAB model • More accurate vehicle dynamics • Time delays • 01/03/07 - C++ implementation