Silicon Valley Berryessa Extension Contracts. Contract Status C222 Kato Grade Separation In Progress C115 Agua Caliente, Fria & Toroges Creeks In Progress C101 Mission/Warren/Truck Rail In Progress C700 Berryessa Extension (SVBX)LTSS In Progress
E N D
Silicon Valley Berryessa Extension Contracts • ContractStatus • C222 Kato Grade Separation In Progress • C115 Agua Caliente, Fria & Toroges Creeks In Progress • C101 Mission/Warren/Truck Rail In Progress • C700 Berryessa Extension (SVBX)LTSS In Progress • (Line, Tracks, Stations, Systems) • C720 SVBX Station Campuses Advertise Early 2014 • Parking structures, roadways, bus bays
Corridor Establishment Activities Kato Road Grade Separation – Construction of DSM Wall
Reasons to replace existing train control equipment: Obsolescence; age of equipment; lack of parts; hard to maintain Performance improvements: capacity, headway, run time, reliability Previous attempt at CBTC failed: AATC 1998-2004 Criteria: Safety Capacity Reliability Maintainability No impact to Operations during transition Train Control Modernization Program
Difficult, time-consuming and expensive implementation Affects wayside, and likely old cars and new cars Overall Program: Duration: 6 to 10 years Cost Estimate: $600-800M Several technologies to be evaluated Initial Phase: Technology Evaluation and Selection Performance Cost Impact to Operations Expected Reliability Train Control Modernization Program
VTA Extension triggers the need for a New OCC Facility New OCC to be coordinated with potential TOD at/near the Station Order of Magnitude Cost: $60M Starting Environmental and Conceptual Engineering Completion: 2018 New Operations Control Center