70 likes | 171 Views
I submitted the jobs for all runs before I left for vacation ; And this morning, I just made several new plots for comparisons (including JH’s suggestion) ; For comparion and “JH’s plot”, I have to use the method of assuming x=y=0 at IP to get the angles for the East or West side separately.
E N D
I submitted the jobs for all runs before I left for vacation ; • And this morning, I just made several new plots for comparisons (including JH’s suggestion) ; • For comparion and “JH’s plot”, I have to use the method of assuming x=y=0 at IP to get the angles for the East or West side separately.
This is the comparison between the –t that I’ve found from 4 equations/4 unknowns and from assuming x=y=0 at IP (2 equations/2 unknowns) • 1st method is a good averaging method as it has tried to be.
Here : (-t) = (-tE) – (-tW) t = [(-tE) + (-tW)]/2 • (-t)/(-t) as suggested by JH (10 bins [0.002, 0.037]) • The last point for EVD_WVU has very few statistics and is out of range • A couple of dt/t distributions for “vertical RP” have double peaks (non-gaussian) but just fitted with gaussian