The Great Blackout. NOV 1, 2007. Booster MMPS Feed. Feed Down 0700-1900. Affects Booster MMPS only. LIPA to de-clutch motor drives to other switches during the work to minimize the possibility of unexpected outages. AGS: Feeder 911-17 outage: Nov 1, 0530-0830 hrs. Houses

marcin
Download Presentation

The Great Blackout

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Great Blackout NOV 1, 2007

  2. Booster MMPS Feed • Feed Down 0700-1900. • Affects Booster MMPS only. • LIPA to de-clutch motor drives to other switches during the work to minimize the possibility of unexpected outages.

  3. AGS: Feeder 911-17 outage:Nov 1, 0530-0830 hrs • Houses • F10(water), H10(UPS, Water), E10, G-I ‘18’s. • AGS Ring Lights G-J. • Ring Crane. • HITL (I, II & III). • RF Lab 925. • 911 New Wing.

  4. AGS II • Substation 1F 0900-1200 • “TRANSPARENT”.

  5. MCR UPS • 2 Hours down 0830-1030hrs. • Affecting MCR and 911 B South Terminal Room - Timing, Video, Security etc.

  6. NOV 1 Access • Booster 0700-1200. • AGS 1100-1300.

  7. Scheduling Meeting • HERE (SNYDER) TOMORROW 1400hrs.

  8. FYI • Test of RHIC fire Bells tonight 1645. • ACS Testing ongoing in the early morning and evenings. • EXPERIMENTAL ACCESS SHOULD NOT BE AFFECTED.