IUID Legacy Ground Equipment Program

IUID Legacy Ground Equipment Program. Item Unique Identification. USMC Legacy Marking DASN ALM IUID Training I 21 April 2011. A/C PS: Col Ed Mays IUID Team Lead: Rick Triviso IUID Project Officer: Gary Ibanez HQMC Advocate: Major Douglas Burke. GDIT IUID Program Manager: Brian Duval

maren
Download Presentation

IUID Legacy Ground Equipment Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IUID Legacy Ground Equipment Program Item Unique Identification USMC Legacy Marking DASN ALM IUID Training I 21 April 2011 A/C PS: Col Ed Mays IUID Team Lead: Rick Triviso IUID Project Officer: Gary Ibanez HQMC Advocate: Major Douglas Burke GDIT IUID Program Manager: Brian Duval GDIT IUID Deputy Program Manager: Beth Mathews ISM Program Manager: Jeff Bailey

  2. MCSC IUID Legacy Approach “Seek & Apply” Process Step 3. Engineering Analysis Step 1. UID Candidacy Process Step 2. Pedigree Data Collection Step 4. Marking Instruction Development • DoD Criteria • Disposal Date • OEM Marking • MEP-I/MCI-LP2 • Collect Data • PM Approval • Deliver Data to Engineer • & TDS Teams • Develop Marking Instruction • Review & Finalize • Upload MI to SharePoint • Conduct CM of MIs • Conduct Analysis • Determine Mark Location • Determine Label Type • Determine Adhesive Type Step 5. Determine Equipment Quantity and Location Step 6. Conduct Inventory & Validate Equipment Data & Location Step 7. Label Upload File & Production • Data Manager develops upload file & places on SharePoint. • QA applied to Data through PDT & TDS. • Updated file returned to Data Mgr. • Label Requests provided to ISM for label production. • Printed Labels Organized by Unit • Receive Baseline Equipment Quantity & MEF Locations • Pull Unit CMRs/SERF Reports • Sort equipment according to owning unit & location • Develop unit inventory sheets.. • Develop initial label requirements. • MMTs conduct inventory to validate serial numbers, quantities, and locations. • Fill out data discrepancy reports. • Provide validated data to data manager & ISM for label production. • Pull appropriate MI for equipment. • Validate Label HRI against Data Plate. • Prep & Clean equipment surface. • Apply IUID label to equipment. • Take picture of data plate & UID label. Step 10. TDS QA, Storage & Upload to DoD Registry Step 8. Mark Equipment per MIs Step 9. Scan Marked Equipment • Scan IUID Label. • Download Scan reports/data. • Upload scan export files to • SharePoint. • TDS applies QA to data. • Resolve Discrepancies • Store QA’d Data • Send TDS upload to DoD Registry. • Confirm Receipt. • DoD Registry Accepts & Approves. • Confirm DoD Registry Approval. Revision 4 – 28 October 2010

  3. MCSC IUID Legacy ApproachUID Candidacy Process Flow

  4. MCSC IUID Legacy ApproachPedigree Data Collection • Pedigree Data Collection, 58 Data Elements • DoD/Registry Criteria • GCSS-MC Requirements • Financial Data

  5. MCSC IUID Legacy ApproachPedigree Data Collection 3. Liaison with PG POCs & Begin Data Collection 1. Provide Information & Status Briefs to PGs 2. Confirm PM POCs 4. Collect & Finalize Pedigree Data (TFSMS, Haystack & MERIT) Gain PM Approval 5. Provide Pedigree Data Information to Engineering 6. Pull MEF Specific Data to MMT Execution Teams to support MMEP & Planning 7. Provide validated MEF Specific Data to TDS Data Mgr 8. Track & Resolve MMT & FSR Discrepancy Reports regarding pedigree data

  6. MCSC IUID Legacy ApproachEngineering Analysis • Identify Existing Drawings or ECPs • Leverage Data Plate – Label Right, Left, Bottom or Top • Conduct Engineering Analysis • Coordinate with PM Systems Engineer • Identify Environmental Conditions • Determine Location • Identify Surface Material • UII Label Size, Materiel & Adhesive • Validate Process, i.e., Test & Evaluation • Develop “Draft” Marking Instruction • PM Approval • Publish Validated Marking Instructions

  7. MCSC IUID Legacy ApproachEngineering Analysis

  8. MCSC IUID Legacy Approach Communications • MEF In-Briefs • Scope, Schedule & Draft Letter Of Instructions • Base Newspaper Article • Command In-Briefs • Item Unique Identification (IUID) 101 • Marine Corps Order 4410.28 • Official Naval Correspondents & Messages • Identify POCs

  9. MCSC IUID Legacy Approach Coordination • Initial PEI Quantity & Locations • Coordinate W/Unit - Obtain Unit CMRs & SER Files • Unit Operational Tempo/Liberty Schedule • Validate TAMCNs Against “To Be Marked” Listing • Commodity Locations • Create Inventory Work Sheets

  10. MCSC IUID Legacy Approach Serf Report

  11. MCSC IUID Legacy Approach “ To Be Marked “ “TO MARK” LIST SCRUBBED ONLY TO INCLUDE PREDESIGNATED NATIONAL STOCK NUMBERS

  12. MCSC IUID Legacy Approach Inventory & Validate • MMTs Inventory & Validate • Create/Populate Data Discrepancy Reports • Quality Control Checks Data • Data Manager Creates Label Production Request • ISM Print Labels

  13. MCSC IUID Legacy Approach Post Inventory Worksheet “TO MARK” Asset OEM Marked Asset Serial Number Discrepancy

  14. MCSC IUID Legacy Approach Label Production Request

  15. MCSC IUID Legacy ApproachLabel Production • Data Manager Uploads File - Label Production • Labels Cleaned & Loaded In Jig • Jig Placed in MMC, Settings & Adjustments Entered • Labels Produced • Labels Verified • Final Quality Control/Assurance • Labels Organized Unit (Binders)

  16. MCSC IUID Legacy ApproachLabel Production

  17. MCSC IUID Legacy ApproachLabel Verification (Good)

  18. MCSC IUID Legacy ApproachLabel Verification (Bad)

  19. MCSC IUID Legacy ApproachMarking • Validate Label Against Equipment’s Data Plate • Prepare/Clean Equipment’s Surface • Apply label IAW Marking Instruction • Scan IUID Label • Photograph Data Plate & Applied Label • Download Scanned Data & Photo • Upload Files to Sharepoint

  20. MCSC IUID Legacy ApproachMarking PICTURE TAKEN AFTER ASSET WAS MARKED

  21. MCSC IUID Legacy Approach Data Synchronization

  22. MCSC IUID Legacy ApproachData Export To TDS