1 / 3

NPAs 26 STATUS JAA/EASA COORDINATION for NPAs 26 MANAGEMENT

NPAs 26 STATUS JAA/EASA COORDINATION for NPAs 26 MANAGEMENT. OST 05-3 19-21 September 2005 WP 35-05 Luana Herescu. NPAs 26 STATUS and JAA/EASA COORDINATION OPTIONS IDENTIFIED BY OST 05-2, REGARDING JAR-26 POSITION a) migrate JAR-26 into JAR-OPS 1, as a new Appendix:

maren
Download Presentation

NPAs 26 STATUS JAA/EASA COORDINATION for NPAs 26 MANAGEMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPAs 26 STATUS JAA/EASA COORDINATION for NPAs 26 MANAGEMENT OST 05-3 19-21 September 2005 WP 35-05 Luana Herescu WP 35-05

  2. NPAs 26 STATUS and JAA/EASA COORDINATION OPTIONS IDENTIFIED BY OST 05-2, REGARDING JAR-26 POSITION a) migrate JAR-26 into JAR-OPS 1, as a new Appendix: b) keep JAR-26 as a stand-alone rule and update it (with existing NPAs) until taken over by EASA; c) hand over JAR-26 to EASA and establish liaison with JAA, for operational issues. If the OST favours option “b”, the following JAA/EASA joint proposal for short-term strategy on managing NPAs 26, is submitted for consideration: WP 35-05

  3. NPAs 26 STATUS and JAA/EASA COORDINATION • PROPOSED STRATEGY for MANAGING EXISTING NPAs 26 • Until EASA establishes competence for operational issues, JAR-26 remains JAA responsibility; • Coordination JAA/EASA would be needed, for updating JAR-26 with the existing NPAs, as indicated in the Tables contained in WP 35-05; • In case an NPA 26 has not been completed, and immediate action is required in relation to a specific aircraft type, the Agency can use the Airworthiness Directive tool, to impose corrective actions; • Rulemaking tasks on similar subjects in CS 25 and JAR-26 should be joint • (if requested by EASA - one drafting group, one Authority taking the lead); • Where an EASA drafting group for CS 25 rulemaking task will also produce the JAR-26 NPA, the EASA group should be composed of members of CSSG; • The EASA drafting group would report to EASA Rulemaking Directorate for the CS 25 issue and to the CJAA OPS DIV, for the JAR-26 issue. WP 35-05

More Related