190 likes | 403 Views
Feasibility Study. PRELIMINARY DRAFT not for circulation. GREAT KEI 6000. November 2013. Eastern Cape Department of Human Settlements. 31-33 Phillip Frame Road Chiselhurst Tel: +27 (0) 43 711 9735. GREAT KEI 6000. Feasibility Report. prepared for. Great Kei Local Municipality
E N D
Feasibility Study PRELIMINARY DRAFT not for circulation GREAT KEI 6000 November 2013
Eastern Cape Department of Human Settlements 31-33 Phillip Frame Road Chiselhurst Tel: +27 (0) 43 711 9735 GREAT KEI 6000 Feasibility Report prepared for Great Kei Local Municipality 12 Murray Street, Tarkastad 5370 Tel. 045 846-0033 Fax: 045 846-0025 by Kantey & Templer PO Box ....., East London Tel; 041 373-0738 CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel; 021 424-5022 Fax: 021 424-6837 IQ Vision 110 Sarel Cillier Street Strand 7140 Tel; 021 853-3902 September 2013
CONTENTS 4.5.1 INTRODUCTION 4.5.1.1 Background to the Settlement 4.5.1.2 Status of Housing projects and Waiting List 4.5.2 STATUS OF HOUSING PROJECTS AND WAITING LISTS 4.5.3 LAND IDENTIFICATION AND OWNERSHIP 4.5.4 ENGINEERING 4.5.4.1 Bulk Services 4.5.4.2 Internal Services 4.5.4.3 Geotechnical Conditions 4.5.4.4 Existing Internal Services 4.5.4.5 Top Structure 4.5.4.6 Traffic Impact Assessment 4.5.4.7 Roads and Accessibility 4.5.4.8 Project Feasibility 4.5.5 DISTRIBUTION OF SOCIAL FACILITIES ENVIRONMENT 4.5.6 GEO-TECH 4.5.7 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 4.5.8 DISTRIBUTION OF SOCIAL FACILITIES 4.5.9 CONCLUSION 4.5.9.1 Summary 4.5.9.2 Recommendations LIST OF MAPS Figure 4.5.1a Aerial Photograph Figure 4.5.1b Site Photographs Figure 4.5.2 Status of Housing Projects Figure 4.5.4a Engineering Figure 4.5.4b Engineering: Site Photographs Figure 4.5.5 Environment Figure 4.5.6 Geo-tech Figure 4.5.7a Current Spatial Development Framework Figure 4.5.7b Current Situation: Site Photographs Figure 4.5.8 Social Facilities LIST OF TABLES Table 4.5a ……. Table 4.5b Comparison of Existing Projects and Existing Population/ Units
4.7 INTRODUCTION 4.7.1 Background to Settlement Great Kei Municipaliy is a coastal municipality in the Eastern Cape. It’s abutted by Buffalo City LM to the west, Amahlathi LM to the north and Mnquma LM to east. Great Kei Municipality incorporates 7 administrative wards that comprise various settlement types ranging from urban to rural. The housing project includes virtually all villages in the entire Great Kei Municipality save those that fall into ward 7. 4.7.1 Status of housing projects and waiting list 950 housing projects have been proposed for Daliwe. These 950 units will be individual subsidies into existing erven. Currently on the housing waiting list are there are approximately … housing beneficiary names have been identified and submitted as of … by the municipality/traditional leaders in the area. Subsequently the cleaning of data received where duplications and insufficient data were removed was undertaken. This resulted in … beneficiaries being pre-screened. Table 4.5bComparison of Existing Projects and Existing Population/ Units
Figure 4.3.8 Status of Housing Projects and Waiting List
4.5.3 LAND IDENTIFICATION AND OWNERSHIP 4.5.3.1 LAND IDENTIFICATION AND OWNERSHIP
4.7.2 SITE PHOTOS Sub Committee member responsible for Rocklands Structure built from local and 2nd hand materials Existing mud structure Toilets built on site on housing subsidy plots Structure built from local and 2nd hand materials Eroded structure built on local materials Police station building School built on local materials Subsistance farming at the local clinic
4.7.7 ENGINEERING BULK SERVICES Existing Services Source of potable water is boreholes. Availability of water is sporadic. Electricity is supplied by Eskom. There is no water-borne sewer system in the area. There is no bulk municipal stormwater management infrastructure in the area. Condition of existing infrastructure is reported to be in good working order. INTERNAL SERVICES Existing Services Potable water reticulation exists with communal stand pipes. No water-borne sewers. All households use VIP toilets. All roads are approximately 5m wide, gravelled and generally with flat gradients. Unlined V-drains along the edges of the road, with stormwater pipes for road crossings with lined V-drains. Low voltage power lines in road reserves with house connections. GEOTECHNICAL CONDITIONS Existing houses appear to be built on strip footings. No major cracking was observed on existing houses. Soil conditions appear favourable for housing development subject to confirmation by a detailed geotechnical investigation. EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING. TOP STRUCTURE A 40 square metre house with a water tank to be provided for all beneficiaries. House foundations expected to be strip foundations. Human Settlements norms and standards for top structures to be applied, such as ceilings, internal & external plaster and paint, concrete roof tiles, etc. No new VIP toilets required. TRAFFIC IMPACT ASSESSMENT The proposed provision of top structures on existing erven does not increase the traffic load on the existing road infrastructure. Therefore no traffic impact assessment is required. ROADS AND ACCESSIBILITY Access is from a gravel trunk road that links to R61. THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.
Figure 4.7.6 Engineering
There are no Critical Biodiversity issues in the municipality. The municipality is incised with many rivers, tributaries and wetlands. As a guideline a 32m buffer ought to be maintained between housing development and any watercourse or wetland. Development is discouraged where the land may be potentially good for agriculture and proclaimed cultivated areas. Vulnerable vegetation must be protected. 4.7.4 ENVIRONMENT
Figure 4.7.4 Environment
The provision of social facilities is guided by the population threshold available to use those facilities. The challenge with rural settlements is their dispersed nature and the associated challenges of transportation and infrastructure to support facility provision. Great Kei Municipality seems to well equipped with educational facilities south of the N2, while north of the N2 they are more clustered towards Komga, possibly due to the spread of settlements. Theirs is an adequate provision of health facilities in the municipality. 4.7.6 DISTRIBUTION OF SOCIAL FACILITIES
Figure 4.7.6 Distribution of Social Facilities
The Spatial Development Framework has indicated areas where residential extension can be located near the main settlements. 4.7.5 CURRENT SPATIAL DEVELOPMENT FRAMEWORK
Await K&T 4.7.3 GEO-TECH
Figure 4.7.3 Geo-tech
Residential extension is proposed southward, west of the main access road into Rocklands across the road from formerly cultivated fields. Identified needs for Rocklands are housing formalisation, access road upgrading, new sites for public worship and cemetery extensions. 4.7.5 CURRENT SPATIAL DEVELOPMENT FRAMEWORK
Figure 4.7.5 Current Spatial Development Framework
4.5.9.1 SUMMARY Great Kei ward 1 - 6 beneficiary list comprised of … people as of the … A total of… were consequently screened after data check and clean. … beneficiaries were successful while … failed the pre-screening process. There are adequate social facilities in Great Kei which are adequately spread and accessible to surrounding households. A 32m buffer from watercourses, water bodies and wetlands needs to be taken as general guideline. The future housing site are in line with the SDF’s proposal for future housing expansion. 4.5.9 CONCLUSION 4.5.9.2 RECOMMENDATIONS In light of this assessment it is recommended that the construction of RDP houses can proceed in Great Kei ward 1-6 following carefully the prescribes of the SDF. The Umzi Choice program ought to be considered as a possible housing delivery instrument in the area.