1 / 10

Pearblossom Geodetic Networks

Pearblossom Geodetic Networks. EDM Network 1980 – 2001 Early 1980s; Frequent Mid 1980s to mid 1990s quarterly measurement Late 1990s to the end annual GPS Network 1995 holc/tabl installed late 1990s dvpb 2001 ll01/pbpp installed Estimate strain change

marge
Download Presentation

Pearblossom Geodetic Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pearblossom Geodetic Networks EDM Network 1980 – 2001 Early 1980s; Frequent Mid 1980s to mid 1990s quarterly measurement Late 1990s to the end annual GPS Network 1995 holc/tabl installed late 1990s dvpb 2001 ll01/pbpp installed Estimate strain change versus time Lancaster Palmdale San Andreas fault

  2. Strain Changes at Pearblossom 237 ± 10 ns/yr 12 ± 10 ns/yr Landers Hector Mine -14 ± 9 ns/yr

  3. Rate removed 237 ± 10 ns/yr 12 ± 10 ns/yr -14 ± 9 ns/yr

  4. Temporal changes in strain??? Langbein and Johnson JGR 1997 Langbein et al. Science 1982

  5. 0.08 ± 0.08 mm/yr 0.07 ± 0.08 mm/yr

  6. -31.05 ± 0.10 mm/yr 7.58 ± 0.03 mm/yr -204 ± 10 ns/yr

  7. Common mode Seasonal displacements Langbein, submitted, JGR, 2007

  8. Comparison of common mode (SCIGN/BARGEN) with translation of Pearblossom GPS network

More Related