1 / 10

FET Plans

FET Plans. FET - Proactive Jean-marie.auger@ec.europa.eu. Outline. Brief summary on coming calls FET FET Flagships f et 11 conference. Call7 close on 18/01/2011. 9.13 - “Exa-scale computing, software and simulation“, M€ 25 Objectives:

marged
Download Presentation

FET Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FET Plans FET - Proactive Jean-marie.auger@ec.europa.eu

  2. Outline • Brief summary on coming calls FET • FET Flagships • fet11 conference

  3. Call7 close on 18/01/2011 9.13 - “Exa-scale computing, software and simulation“, M€ 25 Objectives: • To develop a small number of advanced computing platforms (100 petaflop/s in 2014 with potential for exa-scale by 2020), • To develop optimised application codes driven by the computational needs of science and engineering and of today's grand challenges (e.g. climate change, energy,…) • Addressing major challenges of extreme parallelism with millions of cores (programming models, compilers, performance analysis, algorithms, power consumption ...) 3.4 – Computing Systems, M€ 45 Leonardo.flores@ec.europa.eu Panagiotis.tsarchopoulos@ec.europa.eu

  4. Coming FET Calls • International cooperation on FET research (FET Open 9.4) Call 8 (7/11 – 1/12) • Unconventional Computation • Dynamics of Multi-Level Complex Systems. • Minimising Energy Consumption of Computing to the Limit • new FET topics, coordination of communities … (9.12) Call9 (1/12 – 4/12) • Quantum ICT (including ERA-NET-Plus) • Fundamentals of Collective Adaptive Systems • Neuro-Bio-Inspired Systems • new FET topics, coordination of communities … (9.12) WP 2013 (to be defined) FP8 (to be defined)

  5. FET Flagship Initiatives are Large • Science-driven • Multi-disciplinary • Long-term Foundational • Collaborativeresearch initiatives• Targeting a visionaryS&Tgoal • Seeded from FET ICT but going beyond ICT • Able to generatewaves of technological innovation, with significant impacts on economy and society • Due to size and level of ambition, possible only via federated effort ofthe European Framework and National research programmes • FET Flagships are a response to the fragmentation and the leveraging of investment in basic research seeded from ICT leading towards innovation in technology and societal impact. • Partnerships for Scientific Leadership (link to Action 51 of the DAE) Mission, Impact and Integration

  6. 2009 / 04 COM (2009) 184 'Moving the ICT frontiers’ "Launch at least two FET flagship initiatives by 2013" 2009 / 07ISTAG report on „European Challenges and Flagships - 2020 and beyond" 2009 / 12The COMP Council"invites the Commission to proposeEurope-wide flagship initiatives in FET to tackle specific science andtechnology challenges at the crossover between ICT and other scientificdisciplines" FET Flagships - policy background Unifying efforts around an ambitious long-term scientific goal for critical mass to address key scientific challenges of the 21st Century

  7. The Call for Preparatory Actions Target outcome for “pilots” “Complete design and description of a consolidated candidate FET Flagship Initiative including assessment of feasibility in scientific, technical and financial terms” • well-defined goalthoroughly justified in terms of scientific advance and impact • implementation plan, with an integrative research agendato enable the launch of a FET Flagship by 2013. • identification offinancial resources, • Capacityandclear evidence of commitmentfrom key stakeholders • adequate level of integrationand identityof the supporting communities • operational framework, with an indication of the degree of maturity of the integration of topics and resources over time. 6 projects, with a duration of 12 months

  8. FET–F timeline Launch of Pilots fet11 Launch of Pilot Call End of Pilots Evaluation Close of Pilot Call Flagship Launch 7/10 12/10 5/11 5/12 2013 Pilots Horizontal CSA

  9. fet11 conference • Calls for sessions, exhibition and posters are open www.fet11.eu

More Related