90 likes | 227 Views
Indtryk fra International Applied Reliability Symposium. 28-30 Marts 2012 Warsaw , Polen. 113 deltagere , heraf 4 fra Danmark. Succesful Physical Performance Management by Arkadiusz Burnos. Challenges in Utilizing CMMS Data in Asset Performance Management by Adamantios Meltor.
E N D
Indtryk fra International AppliedReliability Symposium 28-30 Marts 2012 Warsaw, Polen
113 deltagere,heraf 4 fra Danmark ARS 2012 CHS
Succesful Physical Performance Management by ArkadiuszBurnos Challenges in Utilizing CMMS Data in Asset Performance Management by AdamantiosMeltor ARS 2012 CHS
Risk Assesment • Root Cause Analysis • Response ARS 2012 CHS
“Dagens “historietime” • Crow AMSAA) Model Main Results: Growth rate; Demonstrated MTBF; Goodness-of-Fit Test; Confidence Intervals. • Crow Projection model Benyttes i U.S. DoD military handbooks MIL-HDBK-189 De klogeord her: I test skalderskelnesmellemfejlderskyldes “arvedefejl” og fejlderskyldes ting derkanændres ARS 2012 CHS
Split failure by country: Cars in India do not have the same mission profile as cars in Europe. ARS 2012 CHS
LCD TV Failure rate prediction for new designs is VITALLY • IMPORTANT to understand if profit can be achieved from Low • Margin, High Volume products. • In Europe average cost per failure including logistics cost > $150. (selling price ~ $300) ARS 2012 CHS
…fortsat Field Return Rate Accelerated Life Testing Ongoing Reliability Test Yield data ARS 2012 CHS
Spørgsmål? ? ARS 2012 CHS