An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eksperter i Team – Gullfakslandsbyen 2008 Boring, brønn og IOR Torgeir Lund, Gullfaks RFUT

  2. 4D seismikk / monitorering Reservoarkunnskap og -styring Omfattende innfyllende boring og brønningrep Vann og gassinjeksjon Utblokking av prosessanlegg Development of expected recovery 1986 1996 2000 2007 Statfjord 49,4 % 61,4 % 65,6 % 70 % Gullfaks 46,5 % 49,4 % 54,5 % 70 % “Til siste dråpe”Hvilke virkemidler har gitt oss denne utviklingen? Smarte brønner AMEOR og EOR

  3. Active Well Drilling and Workover program from day one • Many productive zones in each well • Sequiential production with many well interventions • Gravelpacking of wells from 1988 • Tractor operations have reduced CT operations • Well sidetracs continue at high rate • Ten TTRD wells in 1997 – 2005 • 10-15 conventional sidetracs of wells per year • All three rigs drilling active from 2006

  4. Well Interventions at Gullfaks

  5. DIACS (smart wells) at Gullfaks No of Smart Well Gullfaks main field : 6 Gullfaks satelites : 5

  6. Profil 1999 - IOR: +190 mill. Sm3 Profil 1988 - Aksellerasjon Tillegg v.h.a. IOR? 70% ? Basis profil 1982 ProduksjonsprofilerTilleggsreserver ved senfaseutvikling 2006 – 2020+?

  7. Gullfaks hovedfelt: Prognose og historisk produksjon GFHF reserver: 358 mill Sm3 Prod: 335 mill Sm3

  8. Gullfaks satelitter: Produksjonsprognose og historisk produksjon GFSAT reserver: 48 mill Sm3 Prod: 27 mill Sm3

  9. IOR potensialer i plattformfelt fordelt på tiltakstype(mill Sm3 olje)

  10. IOR – et deltaprosjekt Planlegger i forhold til en usikker basislinje

  11. Gullfaks Landsbyen 2008……. • Fortsatt mye ugjort på Gullfaks……… • IOR-potensialet tilsvarer et nytt stort satelittfelt • Vurderer IOR prosjekter som kan bidra til fortsatt verdiskaping i denne rike provinsen • Krevende og utfordrende IOR-arbeid for å nå høye ambisjoner