1 / 10

Jerald A. Balta 3/27/2008 Propulsion Team/CAD Final Slides

Explore the cost breakdown of balloon propulsion system in AAE 450 project, covering items like balloon pricing, gondola costs, gas volume calculation, and ground support expenses.

mariol
Download Presentation

Jerald A. Balta 3/27/2008 Propulsion Team/CAD Final Slides

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jerald A. Balta3/27/2008Propulsion Team/CADFinal Slides AAE 450 Spring 2008

  2. Balloon Cost Modifier • Balloon Cost Items • Balloon – Price quote from Aerostar International • Helium – Priced at $4.87 per cubic meter • Gondola- Constant Price of $13205.30 AAE 450 Spring 2008

  3. Balloon Cost AAE 450 Spring 2008 Cost Trend Equation y = -0.0011x2 + 30.62x + 3111.1 y= Cost x=Balloon Payload 3<#>

  4. Balloon Model Buoyancy • Free Body Diagram • Two forces acting on Spherical Balloon • Buoyancy Force • Defined by difference between masses of lifting gas and air multiplied by gravitational constant • Weight Weight

  5. Derivation of Balloon Dimensions • Lifting Coefficient • Ρg is density of lifting gas • Ρa is density of air • Boyle’s and Guy Sac laws • Rho is density • P is pressure • T is Temperature

  6. Derivation of Balloon Dimensions Continued • Combine Equations to determine lifting coefficient for different heights • Take into account 95% Gas purity and standard excess of 15% lifting gas • Final Equation for Volume of Gas in relation to Mass • V is Volume of lifting gas • M is total Mass

  7. Gondola Costs • Structures Cost of $1205.30 • Material • Welding • Riveting • Avionics Cost of $12000 • One Battery • Sensors • Total Gondola Cost of $13,205.30 Provided by Sarah Shoemaker, Structures Group, and Avionics Group

  8. Ground Support and Handling Cost Modifier • Handling – Personnel required for handling of fuels, toxic materials, etc • Ground Support – Based on estimation of salaries of necessary personnel • Assumed $100/hour salary • 6 engineers from all teams and one manager

  9. Cost Modifier

  10. References • Defense Energy Support Center, “MISSILE FUELS STANDARD PRICES EFFECTIVE 1 OCT 2007,” Aerospace Energy Reference, November 2007 • Larson, W.J., Wertz, J.R., "Space Cost Modeling," Space Mission Analysis and Design, 2nd ed., Microcosm, Inc., California and Kluwer Academic Publishers, London, 1992, pp. 715-731. • Smith, Mike, Phone Conversation, Aerostar International, February 15, 2008 • Tangren, C.D., "Air Calculating Payload for a Tethered Balloon System," Forest Service Research Note SE-298, U.S. Department of Agriculture - Southeastern Forest Experiment Station, Asheville, North Carolina, August 1980.

More Related