An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Equilon Pipeline’s Risk Management Program

  2. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 • Background • Risk Screening Scorecard • Data Gathering • Risk Assessment Data Sheets • Risk Assessment Meeting • Documentation Software

  3. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Background • Risk Management Demonstration Project • Conducted Risk Assessments on two major systems • Recognized the importance of aligning/integrating data • Viewing & digesting data was very onerous • There has to be a better way

  4. PIPELINE RISK SCREENING - SCORECARD SCORING PROCESS Abbreviations: CAUSE INDEXESIMPACT INDEXES Outside Force Damage (OF) Population Density (POP) Corrosion (CR) Environment Sensitivity (ENV) Failed Linepipe/Weld (FP) Commodity Hazard (COM1/2) Operations (OP) Release Potential (DIA) Other (OT) Equation: Details: {OF%+CR%+FP%+OP%+OT%} X {[(POP)(COM1)+(ENV)(COM2)][DIA]} = SCORE The statements within each Cause Index are weighted relative to each other by “units” in parenthesis. Cause Indexes are weighted relative to each other by “%” in the upper right-hand corner. A pipeline system’s score for each statement is the product of the entry made (see STEPS) and the “units” shown. Statement scores within a Cause Index are added together, then multiplied by the Index’s weighting to get the Cause Index score. The System Probability score (%) is the sum of the five indexes. The statements within the Population Density and Environment Sensitivity Impact Indexes are weighted by “points” in parenthesis (POP-1 & ENV-1 - points/mile; ENV-2 - points/crossing). A pipeline system’s score for each statement is the product of the entry made (see STEPS) and the “points” shown. These statement scores are added together, then multiplied by factors relating to the Commodity Hazard and the Release Potential (diameter) of the pipeline, to obtain the System Consequence score (points). The System Relative Risk score (points) is the product of the System Probability score (%) and the System Consequence score (points). Probability Consequence Relative Risk 3 of 10

  5. Internal Data Public Data External Data Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Data Sources

  6. Alignment Sheets Smart Pig Data CIS Internal Data Public Data CPDM External Data Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Internal Data Hydraulic Studies

  7. Internal Data Public Data Wetlands Data Nationwide Imagery Data External Data Nationwide DEM Data Nationwide Population Density Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 External Data

  8. HCA Data: High Population Areas Other Population Areas Commercially Navigable Waterways (CNW) Drinking Water Areas Unusually Sensitive Ecological Areas (USAs) Internal Data Public Data External Data Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Public Data

  9. Data Risk dB Risk Application Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Work Flow Processing Data Acquisition Risk Assessment Meeting Risk Assessment Data Sheet

  10. A - Airport B - Business / Office Building C - Church D - Daycare F - Stadium H - Hospital I - Interstate / Highway M - Mall O - Other Public Building P - Park / Recreation Area R - Restaurant S - School T - Hotel / Apartment Y- Yard / Home Population Concerns (High-Occupancy Structures) Equilon Pipeline Company, LLC. Legend - Population Consequence • Data provided by Operations / Maintenance personnel either: 1. Prior to Risk Assessment meeting using “Preliminary” Risk Assessment Data Sheets (instructions provided separately). 2. At Risk Assessment Meeting 10

  11. HPOP Non- Intersecting Non- Intersecting Non- Intersecting Intersecting Intersecting Intersecting OPS - HCA (High Consequence Area) OPOP > 10000 CNW 2501 - 10000 501 - 2500 101- 500 0 - 100 Equilon Pipeline Company, LLC. Legend - Population Consequence • Data maintained and provided by DOT/OPS and displayed by Geofields. Based on intersection with ¼ mile Impact Zone HPOP - High Population Area (Urbanized) OPOP - Other Population Area (Other Incorporated) CNW - Commercially Navigable Waterway Population Density (Per Square Mile from 1990 Census) Based on intersection with ¼ mile Impact Zone • Data maintained and provided by U.S. Census Bureau, displayed by Geofields. 11

  12. Equilon Pipeline Company, LLC. Legend - Potential Release Impact > 10,000 7501 - 10,000 Note: Scale varies by system Drain Volume (Barrels) 5001 - 7500 2501 - 5000 • Drain volume / time obtained from Operations/Engineering using Equilon’s Spill Model, displayed by Geofields. 0 - 2500 5 Hour Graduated Scale (1 Hour Increments) Drain Time (Minutes) Drain Distance (Feet) Graduated Scale (1000 Foot Increments) • Drain distance obtained from Geofields Overland Spread Model using Spill Model output file, displayed by Geofields. 12

  13. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Why this Approach? • Effective • Systematic • Conceptually Simple • Participative • Dovetails with Integrity Rule

  14. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Integrity Rule • Baseline Assessment Plan • Data Integration/Information Analysis • Supports Integrity Assessment Work

  15. Equilon Pipeline Company, LLC. OPS Workshop August 8, 2001 Questions?