1 / 5

Bridge Building Project

Side A vs. Side B Wining team get 5 pts extra credit. Bridge Building Project. Objective: Build a bridge out of k’nex 2 periods to build bridge Must span 3 feet in length No more that 6 inches wide Use C clamps to anchor base of bridge to table

marisa
Download Presentation

Bridge Building Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Side A vs. Side B Wining team get 5 pts extra credit Bridge Building Project

  2. Objective: Build a bridge out of k’nex 2 periodsto build bridge Must span 3 feet in length No more that 6 inches wide Use C clamps to anchor base of bridge to table Must build either a suspension or arch bridge

  3. Suspension: Types Of Bridges

  4. Arch

  5. Spend 5 minutes to discuss with your group review bridge design. Grading Holds 2 brick = C Holds 4 bricks = B Holds 6 bricks = A Before you get started

More Related