An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Project:Bridge Building Lior Shimonovich and Adam Drozdowski

  2. Possible Designs Suspension Flatbed

  3. Why we chose flat…. • Stability • Easier to build • Lighter • Time • Material contraints

  4. The building process -Glue sticks together

  5. The building process (cont’d) -stick units together by glue main structure

  6. The building process (cont’d)

  7. The building process (cont’d) -The polymers were super-glued onto the bridges main structure -Everything is clamped down

  8. The building process (cont’d)

  9. The building process (cont’d)

  10. The building process (cont’d) -Road surface

  11. The building process (cont’d) -More reinforcement

  12. In Conclusion Our bridge can hold…