Final Project: Bridge Building. Lior Shimonovich and Adam Drozdowski. Possible Designs. Suspension. Flatbed. Why we chose flat…. Stability Easier to build Lighter Time Material contraints. The building process. -Glue sticks together. The building process (cont’d).
E N D
Final Project:Bridge Building Lior Shimonovich and Adam Drozdowski
Possible Designs Suspension Flatbed
Why we chose flat…. • Stability • Easier to build • Lighter • Time • Material contraints
The building process -Glue sticks together
The building process (cont’d) -stick units together by glue main structure
The building process (cont’d) -The polymers were super-glued onto the bridges main structure -Everything is clamped down
The building process (cont’d) -Road surface
The building process (cont’d) -More reinforcement
In Conclusion Our bridge can hold…