1 / 23

Market Assessment Action Plan (MAAP)

Market Assessment Action Plan (MAAP). Overview and Update on the:. Deputy Director’s Report:. February 7, 2006 Sustainability and Markets Committee Deputy Director’s Update report. Action Plan Summary. Evaluate the Flow of Materials within the State Focus on Pilot Program Counties

marisol
Download Presentation

Market Assessment Action Plan (MAAP)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Market Assessment Action Plan (MAAP) Overview and Update on the: Deputy Director’s Report: February 7, 2006 Sustainability and Markets Committee Deputy Director’s Update report

  2. Action Plan Summary • Evaluate the Flow of Materials within the State • Focus on Pilot Program Counties • Who benefits from effort • CIWMB • Local Governments • Businesses

  3. Nature of Priority • The MAAP Effort will help shape the CIWMB’s future focus on waste diversion. • Identify barriers and future opportunities for market development • Identify diversion infrastructure • Identify barriers to increasing diversion and achieving zero waste

  4. Nature of Priority (con’t) • Develop a methodology to use statewide • Help CIWMB to better focus assistance • Focus future Waste Characterization Studies

  5. Outline of MAAP Tasks • Identify material types to evaluate • Gather CIWMB based data and develop contact lists • Develop preliminary material flow charts • Define geographic areas • Develop survey tool

  6. Outline of MAAP Tasks (con’t) • Perform site visits • Compile data • Analyze data/Develop conclusions • Review and critique overall efforts and results

  7. Current Status of Targets, Outcomes, and Measures

  8. 1. Identify Disposed Material Types • Paper • Corrugated (6%) • Newsprint (2%) • Miscellaneous Paper (remainder composite) (6%) • Organics • Food waste (15%) • Green waste ( 7%)

  9. 1. Identify Disposed Material Types (con’t) • C&D (18%) • Plastic (1-2%) • pete • hdpe • Misc. containers • Plastic Film (2-4%) • (Note: materials account for approximately 50% of the disposed waste stream)

  10. 2. Gather CIWMB Data and Develop Contact Lists • CIWMB staff evaluated existing • Studies • Reports • Databases • Industry contacts • Infrastructure information • Developed list of key contacts • Etc.

  11. 3. Develop Preliminary Material Flow charts • Using existing data and knowledge the MAAP team developed a series of flow charts using available data. • Flow charts are preliminary • Flow charts will be verified during site visits

  12. Flow of C&D

  13. Flow of Film Plastic • Transport Packaging and non-bag commercial/industrial film

  14. 4. Define Geographic Areas • Original proposal suggested looking at entire state • Through the collective efforts of the team a “pilot” study was developed.

  15. Pilot Program Area MAAP Team selected four (4) counties with different characteristics: Marin San Francisco Sacramento San Joaquin

  16. 5. Develop Survey Tool • Have developed draft surveys • Working with contractor to review, evaluate, and refine to assure survey completeness.

  17. Future Efforts 6. Perform Site Visits • Once survey is finalized Board Staff will gather survey information through visits with: • Local governments • Generators • Haulers • Processors • Others Follow-up, as necessary, to obtain data

  18. Future Efforts (cont’d.) 7. Compile Data & 8. Analyze Data/Develop Conclusions

  19. FutureEfforts (cont’d.) • Review and Critique Overall Efforts and Results: • Assess how well data shows flow • Identify barriers • Modify procedures to reduce or eliminate barriers • Report back to the Board on findings and recommendations for future work

  20. Pilot Data Integration and GIS Study • Board allocated contract funding ($75,000). • Working with IMB to develop a GIS mapping system to show the flows of materials as well as facility locations. • Will provide updates in future Deputy reports as it progresses.

  21. Timeline Completed • Identification of materials types • Development of contact lists • Identified pilot areas Partially completed • Development of survey

  22. Timeline (cont’d.) Future • Site visits • Compile data • Analyze data • Critique and development of recommendations • Develop GIS

  23. Questions?

More Related