1 / 13

MCD Status Report

MCD Status Report. Trevor Watson. 4 February 2008. MCD Status Report. Some facts and figures about the main MCD processes : loading of new documents from 2006 (IPC8 Frontfile) loading of IPC data for pre-2006 documents (IPC8 Backfile) IPC Revision . How much IPC data is there in the MCD ?.

marius
Download Presentation

MCD Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MCD Status Report Trevor Watson 4 February 2008

  2. MCD Status Report Some facts and figures about the main MCD processes : • loading of new documents from 2006 (IPC8 Frontfile) • loading of IPC data for pre-2006 documents (IPC8 Backfile) • IPC Revision

  3. How much IPC data is there in the MCD ?

  4. % documents loaded in MCD with valid IPC8 (by pub date)

  5. Frontfile errors and warnings for documents published in November 2007

  6. MCD backfile history (pre-2006 documents) 2005 - IPC8 derived from ECLA, IPC 1-7 (and incrementally in 2006, 2007) 2006 - AU, DE, JP, EAPO, LT, PT, SI, US 2007 - DE, MD, RO, RU 2008 - BR, CZ, (KR), UA

  7. Sources of backfile data Sources of advanced family-level symbols - January 2008 Overall level of completeness (by document) around 91%

  8. Backfile completeness • overall figure of 91% can only be a rough guide • aspects of completeness • date • kind codes • technical area • quality (the difficult one !) • suggestion : • each NO to produce a standard 'Statement of MCD Completeness' for their own collection

  9. MCD revision life-cycle

  10. Revision periods - docs that arrived after first WLS - docs where new symbols not added

  11. Revision in practice • revision periods overlap more than expected • MCD solution : weekly / monthly procedures • termination of revision period not clearly defined

  12. Sources of IPC8 data • EPOQUE and esp@cenet • regular DocDB bibliographic data products • quarterly IPC8 incremental DVDs • revision results files (yet to be released)

  13. Thank you for your attention ! mcd@epo.org

More Related