EMR Status

EMR Status. Jean-Sebastien Graulich, Geneva. Intro Construction Magnetic shielding Electronics Prototype Cosmics test Schedule. EMR: Electron Muon Ranger. This report is about a team work Como/Trieste: Michela Prest, Erik Vallazza , Daniela Lietti, Davide Bolognini

Download Presentation

EMR Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMR Status Jean-Sebastien Graulich, Geneva • Intro • Construction • Magnetic shielding • Electronics • Prototype Cosmics test • Schedule

  2. EMR: Electron Muon Ranger • This report is about a team work • Como/Trieste: • Michela Prest, Erik Vallazza, Daniela Lietti, Davide Bolognini • University of Geneva: • Franck Cadoux, Florian Maschiotti, Laurent Nicola, CoralieHusi • Pierre Bene, Stephane Debieux • Havard Wisting, Kaspar Rothenfusser • GhislainGrégoire • A lot happened, trying to summarize • Refer to previous presentations for more details • EMR talk at CM25 • EMR Construction Status at VC128 http://mice.iit.edu/vc/vc128/vc128_cadoux_emrstatus.ppt • EMR Cosmic Tests at VC129 http://mice.iit.edu/vc/vc129/vc129_graulich_emrcosmics.ppt • EMR Installation talk at CM2 http://cm26.ucr.edu/wp-content/uploads/presentations/MICE_EMRMar10.pdf

  3. http://indico.cern.ch/getFile.py/access?contribId=28&sessionId=3&resId=0&materialId=slides&confId=69027http://indico.cern.ch/getFile.py/access?contribId=28&sessionId=3&resId=0&materialId=slides&confId=69027 Daniela Lietti CM25

  4. Construction • Main Steps • Cutting to length – done • Gluing fibers (up to 20 per day) • Layer Assembly • Module Assembly

  5. Integration • Extremely compact assembly Outer Box • Difficult access to PMT and electronics after Assembly • Just enough room for local shielding • Heating of electronics (FPGA, HV dividers, etc Flex connector The PMT is attached to the board FEB Shielding not shown

  6. Magnetic Shielding Issue • Situation looked difficult • Impossible to shield locally EMR thickness Plot Field vs PMT location 3D model from Ghislain (OPERA 3D)

  7. Magnetic Shielding Solution • First: Global shield • 50 mm thick iron plate • EMR is moved back (reduce acceptance) • Second: Local shield on PMT EMR PMT axis

  8. Slide 8

  9. Magnetic Shielding Summary • The problem was more serious than originally thought • We have now a satisfactory design • Large iron reflector between KL and EMR • EMR is moved back by 50 mm • Local shielding (1m) around each PMT • We had to stop detector production • 2 months delay • The PMT-Fiber coupling had to be modified • We are ready to resume production

  10. Electronics • Each bar is read out on both side but with independent chains • Digital readout • Each bar is connected to one pixel of a 64 channels MultiAnode PMT • The PMT is connected to a Front End Board (FEB) where the signal is amplified and discriminated • The logic signal from the FEB is sampled by a Digitizer and Buffer Card (DBC) • The DBC stores the data for the entire duration of the spill • The DBC is read out through a VME Controller card at the end of the spill • Analog readout • On the other side • All the fibers from each are bunched together and coupled to a single 1” PMT • The output of the PMT is connected to one channel of a 500 MHz sampling ADC (CAEN V1731) • The data is buffered in the ADC and readout at the end of the spill

  11. Electronics Status • FEB • Designed and produced by Trieste/Como • Based on existing FEB for another experiment (ASACUSA@CERN AD) • Recently modified and tested to use the MAROC amplifier/discriminator chip (instead of Gamma Medica/Ideas VA64TAP) • Digitizer and Buffer Card • Design in progress in Geneva • VME Controller • Based on general purpose VME board provided by Trieste/Como • Clock and Trigger distribution • Under discussion • Sampling ADCs • In hand in Geneva

  12. Cosmics Test • One full module (2 layers) operational in Geneva • DAQ provided by Como/Trieste • Many Thanks to Daniela Lietti and Davide Bolognini 2 EMR Layers Trigger Scintillator 10x10 cm2 2 X-Y Silicon stripdetectors 10x10 cm2

  13. The first EMR Module Multi-anode PMTcoupled to FEB FEB X Y Single anode PMT All fibers bunched

  14. Analysis – Prerequisite • Using the prototype Front-End Board based on the VA64TAP chip • Need to scan the sampling time to determine our working point

  15. Efficiency • Testing different configurations • High Voltage scan • With/Without Optical grease • Standard/Green enhanced PMT • Two independent analysis • Trieste/Como : Michela Prest and Davide Bolognini • Geneva: Havard Wisting Green Enhanced PMT Efficiency ~98 % Standard PMT Efficiency ~93 %

  16. Cross talk • Obvious cross talk between channels • Between anodes • Partially due to the PMT alignment • Not only ! • Between fibers ? • Can improve fiber isolation…

  17. Cosmics test Summary • Currently taking data at about 3 Hz • Efficiency Measurement consistent with First prototype results: ~97.5 % • Cross talk is a serious issue • Next Steps • Integrate the single PMT readout in the DAQ • Need to migrate from SBS Bit3 to CAEN VME-PCi interface first • Test with the first production module • 1.2 mm fibers • More precise PMT lodging • Define automatic test procedure for QA during production

  18. Project Plan • Running full speed, we need 6 working days to produce 1 module (2 layers) => Production time: 7 months • EMR production should end in October 2010 • Digitalization and Buffer card design test and production • Estimated to 6 months • We are considering a partial delivery to RAL this summer in order to have an early test of integration in the DAQ • We also depend on other experiment pressure on our Engineer/Technician staff