Graham Generation and the Market – The Facts October 8, 2008

Graham Generation and the Market – The Facts October 8, 2008. Graham Vitals. Graham 1 in service 1960 225 MW capability Full Load Average Heat Rate = 10.55 Graham 2 in service 1969 375 MW capability Full Load Average Heat Rate = 10.35.

marnin
Download Presentation

Graham Generation and the Market – The Facts October 8, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Graham Generation and the Market – The FactsOctober 8, 2008

  2. Graham Vitals Graham 1 in service 1960 225 MW capability Full Load Average Heat Rate = 10.55 Graham 2 in service 1969 375 MW capability Full Load Average Heat Rate = 10.35 Graham plant is not a low heat rate – high capacity factor facility

  3. Capacity Factors for 12 months ended Sept. 2008 Graham (West) 8.6% Lake Hubbard (North) 9.4% North Zone Fleet 6.1% Graham plant is a similar technology to Lake Hubbard. Neither plant is a high capacity factor facility, since they aren’t competitive with new CCGTs

  4. West - North Congestion: May through Sept 2008 West – North congestion occurred during 8.9% of the intervals during this period Wind production during W-N congestion intervals was: Max – 4,480 MW Avg – 3,323 MW Min – 1,148 MW The 90th percentile of wind production during W-N congestion intervals (i.e. wind production exceeded this value 90% of the time) was 2,454 MW. West to North CSC congestion wasn’t that prevalent during the summer and when it occurred, quite a bit of wind production was occurring.

  5. Graham in West Zone: May through Sept 2008 How correlated is W-N congestion associated with high wind and material amounts of Graham output? Conservatively using 90th percentile wind of 2,454 MW How often were either of these units >> min when BES below 9.5 mmBtu/MWh? Graham #1 LSL = 46 MW % of intervals > 70 MW = 0.1% Graham #2 LSL = 37 MW % of intervals > 60 MW = 0.9% Graham plant very rarely runs above min when: W-N congestion, high wind, and low BES prices. Regulation deployments explain most of this.

  6. North Zone and Wind: May through Sept 2008 How correlated is W-N congestion associated with high wind and NZ MCPE above 9.5 mmBtu/MWh? This should be a proxy for concerns raised by FPL Energy How often was wind >= 2,454 MW & MCPE >= 9.5 mmBtu/MWh Only 1.5% of the intervals The market conditions where Graham being deployed for BES during high wind and W-N congestion are negligible in both the West and North zone

  7. Average MCPE at $74,000,000 OOME Down Payments … 131 hours above 9.5 mmBtu/MWh 517 MW back down of Graham 1 and 2 131 hours * 517 MW = 67,727 MWh 9.5 mmBtu/MWh * $7/mmBtu + $74,000,000/ 67,727 MWh = $1159.12/MWh In past 12 months, BES prices were greater than or equal to $650.72/MWh concurrently with W-N congestion only 6 hours Historical data doesn’t seem to support the assertion of $74,000,000 of OOME