1 / 4

Hi gh Rad iation to Mat erials HiRadMat Project Team Meeting : 29.10.2009

News Presentation and feedback from IEFC Project web pages update Specifications Document Proposal for project milestones. Hi gh Rad iation to Mat erials HiRadMat Project Team Meeting : 29.10.2009. HiRadMat Project Meeting CERN, October 15, 2009. News. IEFC Presentation.

marrim
Download Presentation

Hi gh Rad iation to Mat erials HiRadMat Project Team Meeting : 29.10.2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News • Presentation and feedback from IEFC • Project web pages update • Specifications Document • Proposal for project milestones High Radiationto Materials HiRadMat Project Team Meeting : 29.10.2009 HiRadMat Project Meeting CERN, October 15, 2009

  2. News IEFC Presentation I. Efthymiopoulos • Presentation in IEFC on 16.10.2009 – • slides: https://espace.cern.ch/hiradmat-sps/PresentationsTalks/ie-IEFC_16Oct09.pdf • Feedback • We must come back in a future meeting before Xmas with P+M estimates • The design of the facility must include foreseen upgrades of SPS, i.e. bunch intensities up to 1.7?? × 1011 protons • Design review is welcome, also to verify for the proton beam the situation of spares afterwards • As all new projects, HiRadMat is supposed to prepare a Safety File and a Quality Management plan

  3. News IEFC Presentation BE/ASR/DU will help us implementing it for our project I. Efthymiopoulos

  4. News HiRadMat Project Web space I. Efthymiopoulos Web space: http://cern.ch/hiradmat EDMS space: ongoing (school vacations in between…) Asked to have a CDS series for project publications and official documentation TCC6/TI2 door has been reinforced  access in BA7 not conditioned with LHC powering status (but still of course with SPS2LHC beam injection)

More Related