An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILO Meeting #26 Ongoing and forthcoming Procurement activities 29th September 2014 - San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  2. Reminder: MIG/BI Group F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  3. Magnets (PF Coils) • Awarded: • Winding tooling {OPE-463]: signed with Sea-Alp consortium on 8th of May • On-going: • Impregnation & Additional tooling [OPE-559] • Under evaluation: • Site & Infrastructure Management [OPE-568] • Under preparation: • Manufacturing and cold test [OPE-570](CFT 11/2014) • Cold test engineering study and facility construction [OPE-585]-cf market survey F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  4. In Vessel Divertor Under evaluation: • OMF-567: 3rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015). • Cassette body assembly: market survey mid-2015. (target CFT Q1 2016) First Wall Awarded: • [OPE-443] full scale prototype. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  5. Remote Handling Awarded: Divertor RHS [OMF 340-1] to Assystem UK (rank 1) • On-going: • Cask & Plug RHS [OMF-577] CFEI published 3rd June 2014. Deadline for requests to participate: 4 July 2014. Invitation to dialogue: expected October 2014. • In-Vessel Viewing System [OMF-383] on-going dialogue since mid July 2014. Final invitation to submit tender: December 2014. Tender submission deadline: January 2015. Expected Award: July 2015. • Under evaluation: • Neutral Beam RHS [OMF 340-3] Tender phase ongoing, deadline for submission of tenders 16/06/2014. Expected Award: ExCoJan. 2015. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  6. Cryoplant & Fuel cycle Tritium Plant • Under preparation: • Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q3 2015. Vacuum pumping Awarded:OPE-551: He gas transfer lines. Signed on 04/09/2014 with CriotecImpianti. ITER Cryopump component F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  7. TBM & Materials development TBM Under preparation: • [FPA-611] Helium Cooled Lithium Lead and Pebble Bed simulation tools development (see info day documents). • On-going: • [FPA-603] codes and standards developments for Eurofer 97 material (deadline 17/10). • TBM materials • Under preparation: • 20-25 t of Reduced-Activation Ferritic-Martensitic steel plates Eurofer-97 (RCC-MRx specifications). Target CFT Q4 2014 Ancillary system F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  8. Technical Support • Technical Support • On-going: • [OMF-586] Joining & Testing procedures used in ITER components manufacturing (deadline 01/10). • [OMF-563] material characterization at cryogenic temperature (deadline 30/09). • [OMF-578] Thermo hydraulic and Fluid dynamic analysis (deadline 30/10). F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  9. Planning and Scheduling • Under evaluation: • [OMF 555]: FW for dual use export compliance services • [OMF 556]: FW for Planning and scheduling • [OMF 557]: FW for Quality Inspection F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  10. Neutral Beam & EC Power Supplies 1 MW CW Gyrotron (140 GHz) W7-X Including NBTF [Mitica/Prima/Spider] • On-going: • [OPE-0552] Superconducting magnet for the EU Gyrotron (deadline to submit 03/11/2015) • Under preparation: • [OPE-278]: AGPS-GRPS (target CFT October 2014). • [OPE-307]: MITICA Cryoplant: (target CFT is Q1 2015. • SF6 plant: probably EPC contract. Target CFT Q3 2015. • MITICA beam source. TargetCFT Q2 2015. • Under evaluation: • [OPE-520]: Mitica Vacuum vessel. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  11. Diagnostics Diagnostics[connectors, infrared tech, optical, reflectometers, etc.] • Under preparation: • Bolometer sensor manufacturing (see market survey). • Target CFT Q2 2015. • OuterVesselCoils (OVC): Target CFT Q1-Q2 2015. • Core Plasma Thomson Scattering (CPTS): Target CFT Q3 2015. • ManufacturingDesignSupport (OMF): Target CFT Q2 2015. • Under evaluation: continuous external Rogowski coil [OPE-558]: Target award: 11/2014 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  12. Buildings (and site adaptation) 1/2 • Awarded: • TB02-Lift and cranes [OPE-285] Signed with NKM Noel special cranes (Germany) • TB03-Nuclear tokamak building/assembly hall/doors [OPE-286]: signed with VFR consortium (France-Spain) • TB04- Mechanical & Electrical System [OPE-301]: Signed with GDF-Suez consortium (France-Germany) • TB05- Design & Build package [OPE-378]: Signed with FerrovialAgroman SA (Spain) F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  13. Buildings (and site adaptation) 2/2 • TB06- HV electrical Power distribution [OPE-428]: CFT under preparation (fine-tuning exchanges with IO target CFT Q4/2013) • TB07-Design &Build package [OPE-429]: Signed with FerrovialAgromanSA (Spain) • TB08-site infrastructure [OPE-374]: Signed with COMSA SAU (Spain) • Under preparation: • TB13-Emergency electrical power distribution [OPE-540]: Pre-information notice published • On-going: • TB14-Site Infrastructure Works [OPE-0593]: deadline for submission 06/10/2014 • General strategy presentation to be updated soon. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  14. Antennas & Plasma Engineering EC launcher • Antennas • On-going: • Contract for support for design of cooling systems [OFC-0569]: deadline for submission is 15/09/14 • Under preparation: • Physics and engineering modeling for plasma control and scenarios • Additional heating systems analysis • Disruption modeling and simulation • Plasma control system design • Antennas engineering support & analysis • Scenario & plasma performance analysis Antennas F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian

  15. ILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF coils cold tests Market Surveys to come DIVERTOR – Cassette assembly, Q1 2015 EC UL/CODAC – System and Instrumentation Engineering Support, Q3 2014 Info Days to come 10thJune 2015: F4E Forum F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian