ILO Meeting #26 Ongoing and forthcoming Procurement activities 29th September 2014 - San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Reminder: MIG/BI Group F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Magnets (PF Coils) • Awarded: • Winding tooling {OPE-463]: signed with Sea-Alp consortium on 8th of May • On-going: • Impregnation & Additional tooling [OPE-559] • Under evaluation: • Site & Infrastructure Management [OPE-568] • Under preparation: • Manufacturing and cold test [OPE-570](CFT 11/2014) • Cold test engineering study and facility construction [OPE-585]-cf market survey F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
In Vessel Divertor Under evaluation: • OMF-567: 3rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015). • Cassette body assembly: market survey mid-2015. (target CFT Q1 2016) First Wall Awarded: • [OPE-443] full scale prototype. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Remote Handling Awarded: Divertor RHS [OMF 340-1] to Assystem UK (rank 1) • On-going: • Cask & Plug RHS [OMF-577] CFEI published 3rd June 2014. Deadline for requests to participate: 4 July 2014. Invitation to dialogue: expected October 2014. • In-Vessel Viewing System [OMF-383] on-going dialogue since mid July 2014. Final invitation to submit tender: December 2014. Tender submission deadline: January 2015. Expected Award: July 2015. • Under evaluation: • Neutral Beam RHS [OMF 340-3] Tender phase ongoing, deadline for submission of tenders 16/06/2014. Expected Award: ExCoJan. 2015. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Cryoplant & Fuel cycle Tritium Plant • Under preparation: • Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q3 2015. Vacuum pumping Awarded:OPE-551: He gas transfer lines. Signed on 04/09/2014 with CriotecImpianti. ITER Cryopump component F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
TBM & Materials development TBM Under preparation: • [FPA-611] Helium Cooled Lithium Lead and Pebble Bed simulation tools development (see info day documents). • On-going: • [FPA-603] codes and standards developments for Eurofer 97 material (deadline 17/10). • TBM materials • Under preparation: • 20-25 t of Reduced-Activation Ferritic-Martensitic steel plates Eurofer-97 (RCC-MRx specifications). Target CFT Q4 2014 Ancillary system F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Technical Support • Technical Support • On-going: • [OMF-586] Joining & Testing procedures used in ITER components manufacturing (deadline 01/10). • [OMF-563] material characterization at cryogenic temperature (deadline 30/09). • [OMF-578] Thermo hydraulic and Fluid dynamic analysis (deadline 30/10). F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Planning and Scheduling • Under evaluation: • [OMF 555]: FW for dual use export compliance services • [OMF 556]: FW for Planning and scheduling • [OMF 557]: FW for Quality Inspection F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Neutral Beam & EC Power Supplies 1 MW CW Gyrotron (140 GHz) W7-X Including NBTF [Mitica/Prima/Spider] • On-going: • [OPE-0552] Superconducting magnet for the EU Gyrotron (deadline to submit 03/11/2015) • Under preparation: • [OPE-278]: AGPS-GRPS (target CFT October 2014). • [OPE-307]: MITICA Cryoplant: (target CFT is Q1 2015. • SF6 plant: probably EPC contract. Target CFT Q3 2015. • MITICA beam source. TargetCFT Q2 2015. • Under evaluation: • [OPE-520]: Mitica Vacuum vessel. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Diagnostics Diagnostics[connectors, infrared tech, optical, reflectometers, etc.] • Under preparation: • Bolometer sensor manufacturing (see market survey). • Target CFT Q2 2015. • OuterVesselCoils (OVC): Target CFT Q1-Q2 2015. • Core Plasma Thomson Scattering (CPTS): Target CFT Q3 2015. • ManufacturingDesignSupport (OMF): Target CFT Q2 2015. • Under evaluation: continuous external Rogowski coil [OPE-558]: Target award: 11/2014 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Buildings (and site adaptation) 1/2 • Awarded: • TB02-Lift and cranes [OPE-285] Signed with NKM Noel special cranes (Germany) • TB03-Nuclear tokamak building/assembly hall/doors [OPE-286]: signed with VFR consortium (France-Spain) • TB04- Mechanical & Electrical System [OPE-301]: Signed with GDF-Suez consortium (France-Germany) • TB05- Design & Build package [OPE-378]: Signed with FerrovialAgroman SA (Spain) F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Buildings (and site adaptation) 2/2 • TB06- HV electrical Power distribution [OPE-428]: CFT under preparation (fine-tuning exchanges with IO target CFT Q4/2013) • TB07-Design &Build package [OPE-429]: Signed with FerrovialAgromanSA (Spain) • TB08-site infrastructure [OPE-374]: Signed with COMSA SAU (Spain) • Under preparation: • TB13-Emergency electrical power distribution [OPE-540]: Pre-information notice published • On-going: • TB14-Site Infrastructure Works [OPE-0593]: deadline for submission 06/10/2014 • General strategy presentation to be updated soon. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
Antennas & Plasma Engineering EC launcher • Antennas • On-going: • Contract for support for design of cooling systems [OFC-0569]: deadline for submission is 15/09/14 • Under preparation: • Physics and engineering modeling for plasma control and scenarios • Additional heating systems analysis • Disruption modeling and simulation • Plasma control system design • Antennas engineering support & analysis • Scenario & plasma performance analysis Antennas F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian
ILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF coils cold tests Market Surveys to come DIVERTOR – Cassette assembly, Q1 2015 EC UL/CODAC – System and Instrumentation Engineering Support, Q3 2014 Info Days to come 10thJune 2015: F4E Forum F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian