Dansko Phase III West Grove, PA. David Rosenberger Lighting/Electrical Lighting Advisor: Dr. Mistrick Electrical Advisor: Ted Dannerth. Project Team. Owner: Dansko, Inc. Architect: Bernardon Haber Holloway MEP/Lighting Design: Brinjac Engineering, Inc.
E N D
Dansko Phase III West Grove, PA David Rosenberger Lighting/Electrical Lighting Advisor: Dr. Mistrick Electrical Advisor: Ted Dannerth
Project Team Owner: Dansko, Inc. Architect: Bernardon Haber Holloway MEP/Lighting Design: Brinjac Engineering, Inc. Structural: Baker, Ingram & Associates Civil: Gilmore & Associates Interior: Contract Environments Geotech: Advanced GeoServices Construction Management: W.S. Cumby & Son, Inc. Data/Comm: Tangent Cable
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Design Intent – Direction …through the space… …draw attention to your feet… Atrium
“Ribbons of Light” Diffusing Lens Recessed “Basket” Style Direct/ Indirect Recessed Perimeter Wallwash Striplights Translucent Acrylic “Shoebox”
Square Downlight Elliptical Reflector Uplight Handrail-IntegratedLED Strip
Average Illuminance: 16 fc Maximum/Minimum Illuminance Ratio: 3.25:1 Atrium
Average Illuminance: 16 fc Maximum/Minimum Illuminance Ratio: 1.57:1 Atrium
Average Illuminance on Task Plane: 31 fc Maximum/Minimum Illuminance Ratio: 2.25:1 Atrium
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Design Intent – Focus Design Production Presentation Open Office
Indirect T5HO Luminaires Integrated into Furniture Recessed T5 Downlights with Blade Louvers Recessed Adjustable MR-16 Downlights
Average Illuminance on Task Plane: 36 fc Maximum/Minimum Illuminance Ratio: 1.56:1 Open Office
Average Illuminance on Ceiling: 78 fc Maximum/Minimum Illuminance Ratio: 5.42:1 Open Office
Average Illuminance on Task Plane: 34 fc Maximum/Minimum Illuminance Ratio: 1.19:1 Open Office
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
High Light Reflectance Ceiling 15% Higher Reflectance than Average Lay-in Ceiling Tile Allows for a reduction in Lighting Power Density Open Office
High Light Reflectance Ceiling -Reduced Number of Luminaires Exposed Structural Ceiling -Standard Layout of Indirect Pendants
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Outline LIGHTING DEPTH Atrium Lighting Design Open Office Lighting Design MECHANICAL BREADTH Open Office Energy Analysis with High Light Reflectance Ceiling ELECTRICAL DEPTH Emergency Generator Cu vs. Al Feeder Material CONSTRUCTION MANAGEMENT BREADTH Integrating Luminaires into Furniture
Custom integration of indirect luminaire into office workstation 10-12 week lead time to be UL safety certified Two Electricians 6.5 hours $527
Thank you! Questions?